QA Report QA Report
Features Pricing CMM Software MES Ballooning Tool Blogs Gallery Contact Request Enterprise Demo

Help Center

Everything you need to create inspection reports, balloon drawings, import CMM data and run production with QA Report.

  • Getting Started
  • Machine File Upload
  • User Roles & Permissions
  • Understanding Groups
  • Dashboard
  • Measurement Types
  • Canvas / Drawing Page
  • PDF Export
  • Report Search
  • Wizard Mode
  • Report Details & Editing
  • Sharing & Collaboration
  • Units & Precision
  • Statistics & Analysis
  • Projects
  • Manufacturing (MES): Parts, Batches, Route Cards
  • CRM: Customers, Quotes, Invoices
  • Report Status & Kanban
  • CMM Data Import
  • Report Export/Import
  • Troubleshooting
  • Subscription Plans
  • Admin Panel Features
  • Keyboard Shortcuts
  • Contact & Support
  • Inventory Control
  • Platform Architecture & Security

Getting Started

Creating Your First Report

  1. On the dashboard click New Report.
  2. Fill in the report fields (at least the required ones, marked *). Optional: open Import from a machine file or ZIP (optional) to fill fields and measurements from a file, or add a Part Image.
  3. Click Create Report.
  4. On the report page click Upload Drawing and choose the part drawing (PDF or image). You go straight to the Canvas.
  5. Add balloons by hand or with AI Detect, then enter the measured values in the table or with the Wizard.
  6. Export the report as PDF or Excel from the Actions menu.

Tip: open Ruby (bottom right) and click Guide me for a step-by-step walk-through.

Report Fields Explained

  • Customer: Client or company name
  • Part Name: Description of the part being inspected
  • Drawing Number (DRW NO): Engineering drawing reference
  • Revision (REV): Drawing revision number
  • Inspector: Person performing the inspection
  • Order Number: Purchase order or work order reference
  • Sample Size: Number of parts being inspected
  • Machine: Inspection equipment used

Guided First Report (Guide me)

Guide me walks you from an empty dashboard to your first AI-detected dimensions. Open Ruby (bottom right) and click Guide me.

  1. Click New Report.
  2. Fill in Customer and DRW NO.
  3. Click Create Report.
  4. On the report page click Upload Drawing.
  5. On the Canvas, unlock the drawing.
  6. Click AI Detect.
  7. Drag a box around one view or a group of dimensions.

The current step glows yellow and a small box next to it explains what to do. Nothing is blocked: you can use every button while the guide runs, and it moves on by itself when you do the step. Click Skip step to go on, or Stop guide to end it. Start it again any time from Ruby > Guide me.

Ruby

Companies with Ruby see a Ruby button at the bottom right of the dashboard, the Admin page, reports, projects, Inventory, CRM and Help. Click it to open Ruby.

Create your first report: click Guide me for a step-by-step walkthrough. It waits for each real click: New Report, the report fields, Upload Drawing, then AI Detect on the Canvas.

Get started: a short checklist of what to set up. Done steps turn grey with a check mark and stay clickable, so you can open them again. Click any step and the app opens the right page and highlights the place.

  • Everyone: Create your first report, Upload a drawing, AI Detect balloons, Enter measurements, Export a PDF.
  • Admins also: Add your logo to the PDF, Invite a teammate, and Create a project when Projects are part of your plan.

New users see the panel once on their first login (on a phone the button shows a dot instead).

Suggestions: now and then Ruby offers one step you have not done yet, right after you finish something or when you open the dashboard. Never while a dialog is open, at most once a day. Choose Yes, help, Not now or Don't show again. To stop all suggestions for yourself, turn on Do not show suggestions in the panel. Admins can switch Ruby suggestions off for the whole company in Admin > Users & Groups.

Shared logins: people who share one login also share one checklist.

Machine File Upload

How to Upload Machine Files

Automatically fill in report details by uploading a machine inspection file:

  1. Click New Report
  2. Open Import from a machine file or ZIP (optional)
  3. Under Machine File Upload (Optional), choose your machine file (any text file, max 5MB)
  4. Choose the Units (mm or inch)
  5. Fields fill in automatically: Customer, Drw No, Rev, Order No, Machine, Inspector, plus the measurements
  6. Review the filled data and complete any remaining fields

The imported file is saved on the report under CMM Files.

Smart Features

  • Detects and corrects common typos (e.g., "BACH NO" to "BATCH NO")
  • Supports multiple field name variations (set them in Recognize in machine file in Report Fields Settings)
  • Any text file up to 5MB
  • Recovers from damaged lines where it can and flags rows that need review
  • Thread callouts are kept as text, not read as numbers
  • Dimension Identifiers and Comment Section settings (Admin) adapt the import to your files
  • Safe: Won't overwrite existing form data

Expected File Format

Lines in machine files start with double asterisk (**) followed by field name and value:

  • CUSTOMER: ACME CORP
  • DRW NO: 142-DS-5421
  • REV: C
  • BATCH NO: 1456775
  • INSPECTOR: ALEX
  • MACHINE: LK

Skipping Part of a Machine File

Tell QA Report to ignore part of a CMM or machine file, for example a block of trial measurements:

  1. An Admin turns on Comment Section in Admin Panel > Report Fields Settings and sets the Comment mark (default #####, at least 2 characters).
  2. In the file, put the mark on its own line before the block to skip, and again after it.

The first mark starts the skipped part, the next one ends it. Skipped lines are read as if they were not in the file. Put the marks between dimension blocks. The original, unfiltered file is still kept under CMM Files on the report.

Position Headers with Three Numbers (DIM 5-6-22)

A header with exactly three numbers over a two-line Position record, for example **DIM 5-6-22, creates three rows:

  • Dim 5: the Position, with the tolerance from line 1 as written (no MMC bonus).
  • Dim 6: a Linear row from line 1 (nominal and actual).
  • Dim 22: a Linear row from line 2.

Headers with two numbers (**DIM 90-91) or four or more numbers are read as before.

User Roles & Permissions

Role Types Overview

RoleReport VisibilityInspector AssignmentUse Case
UserOwn reports onlySelf only (auto-assigned)Individual inspectors
PowerUserOwn + group members' reportsSelf + group membersTeam leads, supervisors
AdminAll organization reportsAnyone in organizationQuality managers, owners

User Role Details

  • Report Visibility: Can see only reports where they are assigned as the inspector
  • Creating Reports: Automatically assigned as inspector. Dropdown shows only their own name.
  • Editing: Can edit their own reports
  • Deleting: Can delete reports they created or are the inspector of. Only an Admin can restore a deleted report.

PowerUser Role Details

  • Report Visibility: Can see their own reports plus all reports from users in the same groups
  • Creating Reports: Inspector dropdown shows themselves and all active users from their groups
  • No Group Membership: If not assigned to any group, functions like a regular User
  • Editing: Can edit reports they have visibility to
  • Deleting: Can delete reports they created or are the inspector of. Only an Admin can restore a deleted report.
  • Also: Inventory Control, and renaming or deleting Report Groups

Admin Role Details

  • Report Visibility: Can see all reports in the entire organization
  • Creating Reports: Can assign any active user in the organization as inspector
  • Editing: Can edit any report in the organization
  • Deleting: Can delete any report and restore deleted reports within 90 days
  • User Management: Can add users, change roles, and deactivate or reactivate users
  • Group Management: Can create and manage groups
  • Organization Settings: Admin Panel, tolerance tables, measurement types and tools

Understanding Groups

What Are Groups?

Groups organize users into teams and affect what PowerUsers can see.

  • Creating Groups: Admin Tools > Admin Panel > Org & Users & Groups > Group Management
  • Adding Users to Groups: on the same page, edit the user and select Groups
  • Effect on PowerUsers: A PowerUser sees all reports from users in any group they share membership with
  • Multiple Groups: Users can belong to multiple groups. PowerUsers see reports from ALL their shared groups.

These user groups are different from Report Groups, which are labels on reports (see Report Status & Kanban).

Example Scenario

If PowerUser "John" belongs to "Team A" and "Team B":

  • John sees his own reports
  • John sees all reports from Team A members
  • John sees all reports from Team B members
  • When creating a report, John can assign to himself or any Team A/B member

Dashboard

Dashboard Overview

The Dashboard gives a quick overview of your inspection work:

  • Header: your organization, role and plan, the Admin Tools and Help menus, the language menu, light/dark theme and Sign Out.
  • Statistics cards: reports, customers, active work and team members.
  • Quick actions: New Report (or + New Project in Projects view) and Search Reports.
  • Board: the Kanban of reports by status, or Show in Groups to see report groups.
  • Ruby (bottom right): help, a get-started checklist and Guide me.

Kanban Board

Visual workflow management with drag-and-drop:

  • To Do: New reports ready to start
  • In Progress: Reports currently being worked on
  • For Review: Reports ready for quality review
  • Done: Completed reports (shows last 2 weeks)

Drag report cards between columns to change status instantly.

Header Menus: Admin Tools and Help

Two menus sit next to the dashboard title:

  • Admin Tools: Admin Panel (Admin), Inventory Control (Admin and PowerUser) and CRM (Admin). Each item shows only if your role can open it. Users do not see this menu.
  • Help: View Help opens this Help page. Report a problem sends a problem report to our support team (see Contact & Support).

On phones the menu labels are hidden and only the icons show.

Changing the Language

Click the flag button in the dashboard header to change the language. Available: English, Français, Español, Deutsch, Русский, עברית and 中文. The app switches immediately.

Measurement Types

Supported Measurement Types

QA Report supports various measurement types including:

  • Dimensional: Linear measurements (length, width, height), diameters, radii and angles
  • Geometrical (GD&T): Position, flatness, perpendicularity, parallelism, concentricity, cylindricity, circularity, profile, runout, angularity, symmetry, straightness
  • Text: notes and callouts that are not numbers, such as thread sizes

Tolerance Types

  • Bilateral: Equal plus/minus tolerance (e.g., 10.0 ±0.1)
  • Unilateral: One-sided tolerance
  • Limit: Upper and lower limit values

Tol+ Symbols: Diameter, MMC, LMC, Projected, Free State, Unequal

Add GD&T modifier symbols to a row's tolerance:

  1. On the Report page, double-click the Tol+ cell (desktop only, report not read-only).
  2. The Bonus / Reference popup opens. Click to turn each symbol on or off:
  • Diameter (⌀)
  • MMC (circled M) or LMC (circled L). Only one of the two can be on.
  • Projected (circled P), Free state (circled F), Unequal (circled U). These can be combined with each other and with MMC or LMC.
  1. Click Close. Changes save immediately.

The symbols show after the Tol+ value in the table and in the PDF, in the order M or L, then P, F, U. Projected, Free state and Unequal are shown on the report only. They do not change the pass/fail calculation. MMC turns on the bonus tolerance (see Statistics & Analysis > Bonus Tolerance).

Degree Sign on Angle Values

Rows with the dimensional Angle type show a degree sign (°) after Nominal, Tol+, Tol-, every S.N. value and Min/Max/Range. This applies in the Report table, the Canvas table, the Wizard and the PDF.

The sign is only shown, it is not part of the value: type numbers as usual. Angularity is a geometrical tolerance and does not get a degree sign.

General Tolerance on a Report

Many drawings print a tolerance only on some dimensions and leave the rest to a general tolerance table in the title block (for example ISO 2768-m). QA Report can fill those blank tolerances for you.

  1. An Admin creates the tables first (Admin Panel > Reports > Tolerance Tables).
  2. Open the report and the Report Details panel.
  3. Under General tolerance, choose a table, then choose a Class.
  4. From now on, every dimensional row with a nominal and no tolerance gets Tol+ and Tol- from the table. This works when you type a nominal in the report table, on the Canvas, in the Wizard (Design mode) and with AI Detect.

Good to know:

  • A tolerance already entered (or printed on the drawing) is never overwritten.
  • If you change the nominal of a row the table filled, the tolerance follows the new nominal.
  • Only tables in the report's unit (mm or inch) are offered. If there are none, the selector says so and tells you where to create one.
  • Choose None to stop filling tolerances.

Canvas / Drawing Page

Canvas Features

The Canvas page allows you to:

  • Upload and view engineering drawings (PDF, images)
  • Add balloon callouts to drawings
  • Link balloons to measurement rows
  • Rotate and zoom drawings
  • Export annotated drawings to PDF
  • Use drawing tools for annotations
  • Auto-detect existing balloons on drawings

Adding Balloons

  1. Upload a drawing or select an existing one
  2. Click on the drawing where you want to place a balloon
  3. The balloon number corresponds to the Dim NO in the measurement table
  4. Balloons are saved automatically with the report
  5. Drag balloons to reposition them
  6. Delete balloons by selecting and pressing Delete or using the toolbar

Balloon Size and Color

In Balloon mode the Canvas toolbar shows:

  • Size: size of the balloons you place (10 to 40).
  • Color: fill color of the balloons you place.

The style is saved with the report. To color single balloons, use the annotation tools: in Select mode click balloons to fill them with the stroke color. Clear all balloon fill colors removes the fills.

AI Detect

Let AI read the dimensions on your drawing and add balloons and table rows for you:

  1. Select a part in Part Select at the top of the Canvas.
  2. Unlock the canvas.
  3. Click AI Detect (the centred button in the toolbar). Click it again to leave AI Detect.
  4. Drag a box around the dimensions you want, then click Detect this region. Nothing is sent until you confirm, and Cancel discards the box.
  5. Review the new rows and balloons.

AI Detect works on the report's primary drawing. It is enabled per organization; if you do not see the button, contact us.

Annotation Tools

Add annotations on top of the drawing. Unlock the canvas first, then turn the annotation tools ON with the ON/OFF toggle in the toolbar.

  • Select: pick shapes (hold Ctrl to pick several); click balloons to fill them with color.
  • Shapes chooser: Circle, Rectangle, Rounded rectangle, Triangle, Rhombus, Parallelogram, Left brace, Right brace.
  • Line styles chooser: Line, Arrow, Double arrow.
  • Free Draw and Text.
  • Upload Image: place a PNG or JPEG on the drawing, then drag, resize or rotate it.
  • Stroke Color, Fill Color, Fill Transparency, stroke width (1-20) and text size (8-72).
  • Delete selected shapes, or clear all annotations on the current page.

Annotations are included when you export the drawing to PDF. Lock the canvas when done to avoid accidental changes.

Multi-Page Drawings

Navigate multi-page PDF drawings:

  • Use the page navigation arrows at the bottom
  • Each page can have its own balloons
  • Balloons are linked to specific pages
  • When exporting, all pages with balloons are included

Zoom and Pan

Navigate the drawing:

Desktop:

  • Scroll wheel: Zoom in/out
  • Click + Drag: Pan the drawing
  • Zoom buttons: Use +/- in toolbar

Mobile/Tablet:

  • Pinch: Zoom in/out
  • Two-finger drag: Pan the drawing
  • Double-tap: Reset zoom

Rotate Drawing

Rotate the PDF drawing if it's oriented incorrectly:

  • Click Rotate Left (↺) or Rotate Right (↻) in the toolbar
  • Rotation is saved to the PDF file
  • All balloons maintain their relative positions

Lock / Unlock Mode

The canvas has two modes:

Locked (default):

  • Can only pan and zoom
  • Cannot add or move balloons
  • Prevents accidental changes

Unlocked:

  • Can add, move, delete balloons
  • Access to drawing tools
  • Full editing capability

Click the Lock/Unlock icon to toggle. The canvas auto-locks when you leave the page.

AI Detect: Auto and Semi-Auto

While AI Detect is on, a bar at the top of the drawing offers two ways to work:

  • Auto: drag one box around an area with several dimensions. A Detect this region / Cancel bar appears under the box. Nothing is sent until you click Detect this region. All dimensions found are added and ballooned at once.
  • Semi-Auto: draw a box around each dimension separately. The bar shows how many regions you marked. Click Detect to read them all, or Clear to remove the boxes.

General Tol.: tick it and enter a value (for example 0.1) to give detected dimensional rows (lengths, diameters, radii, angles) a +/- tolerance when the drawing shows none. If the report has a general tolerance table selected, the table is used first. A tolerance printed on the drawing always wins.

How AI Detect Places Balloons

  • Balloons are numbered clockwise around the drawing view, starting at the 9 o'clock position.
  • Numbering starts from the Next # box.
  • Balloons are kept a minimum distance apart and moved off the dimension text so they do not cover it.
  • A chamfer written with a degree sign (for example 1.50 X 45°) becomes two rows and two balloons: the size and the angle. Chamfers without a degree sign (0.2 X 0.6 CHAMFER, C2) stay one row.
  • Thread callouts (for example M5X0.8) are kept as text in Nominal.
  • A size and a feature control frame close together become separate dimensions.

Always review the detected rows. You can drag balloons, edit values and delete rows as usual.

Next Balloon Number (Next #)

In Balloon mode and in AI Detect mode, the toolbar shows a Next # box with the number the next balloon will get, whether you place it by hand or with AI Detect.

  • Type a higher number to skip ahead (for example to start a new page at 100).
  • The number must be higher than every balloon number already used, even where there are gaps. If you type a lower one, the box goes back to the next number after the highest, and its tooltip tells you which it is.
  • Gaps in the numbering stay until you use Dim Reorder (Actions menu).

Changing a Dim No

On the Canvas: unlock the canvas, then double-click the Dim cell of a row in the measurement table (desktop). Enter the new number. The row, its sub-dimensions (for example 5.1, 5.2) and its balloon on every drawing all move to the new number. A single click on the cell still zooms to the balloon.

On the Report page: type the new number directly in the Dim No cell.

The number must be a whole number of 1 or higher and must not already exist. Otherwise you see a warning and nothing changes. Renaming is not possible in Wizard mode or while AI Detect is running.

Note: if a CMM program was written for the old numbers, it will no longer match the renamed dimension.

PDF Export

Export Settings

Export reports to PDF with customizable settings:

  • Header Color: Set your organization's brand color
  • Banner Image: Upload company logo
  • Signature: Include inspector signature (if configured)
  • Show/Hide Balloons: Toggle balloon visibility in PDF

Export Options

From the report Actions menu (☰):

  • Export > PDF (portrait or landscape) or Excel
  • Print: print the report directly
  • Export All: merge the report PDF with drawings, material certificates and other documents into one PDF. Choose and drag to order the documents.

On the Canvas, Actions > Export PDF exports the drawing with its balloons and annotations.

Excel Export

Download the measurement table as an Excel (.xlsx) file:

  1. Open the report.
  2. Open the Actions menu (☰) > Export > Excel.

The file has a styled header with the report fields, every S.N. column and out-of-tolerance values highlighted. Rows without a measured value get no Status.

Report Search

Search Features

Search and filter reports across your organization:

  • Configure visible columns. The Project column is optional: hide it together with its filter if you do not use projects.
  • Per-column filtering with operators (Contains, Equals, Starts with)
  • Sort by any column
  • Pagination with customizable page size
  • Drag-and-drop column reordering
  • Group column: shows the report group (see Report Status & Kanban > Report Groups). It is on by default, filters like any other column and suggests existing group names while you type.
  • Actions on selected reports: tick reports to Change Status, Lock / Unlock, Assign Inspector, Export Reports, Duplicate, Create Template (one report) or Delete.
  • Show deleted (Admin): list deleted reports and Restore them within 90 days.

Wizard Mode

Measurement Wizard Overview

The Measurement Wizard helps streamline data entry by guiding you through each dimension:

  • Navigate through dimensions one at a time
  • See which measurement tool to use
  • Canvas auto-pans to show the relevant balloon
  • Large input field optimized for quick entry
  • Filter options to focus on specific dimensions

Starting the Wizard

  1. Go to the Canvas page for your report
  2. Ensure balloons are placed on the drawing
  3. Click the Wizard button (magic wand icon)
  4. In Select Measurement Tools, choose a mode:
  • Design: go through all dimensions to define or edit nominal, tolerances and tools
  • Inspect: go through dimensions with the selected tools and empty S.N. fields
  1. Select the tools you will use (Select All / Select None)
  2. Optional: tick Order by tool and Show Critical Dimensions Only
  3. Click Start Wizard

Tip: Select only the tools you have ready to minimize switching. In Design mode, a general tolerance table selected on the report fills blank tolerances as you enter nominals.

Wizard Navigation

Navigate through dimensions:

  • Forward/Back arrows: Move between dimensions
  • Keyboard arrows: Up/Down to navigate
  • Progress indicator: Shows current position (e.g., "5 of 23")

The canvas automatically pans to center on the current dimension's balloon.

Wizard Filters

Focus on specific dimensions:

  • Critical Only: Show only dimensions marked as critical
  • Empty Only: Show only dimensions without measurements
  • Show Empty Tool: Include dimensions with no tool assigned

Filters help you focus on what matters most for your current inspection.

Entering Measurements

For each dimension the wizard shows:

  • Dimension number (balloon number)
  • Measurement tool icon (what to use)
  • Nominal value with tolerances
  • Large input field for your measurement

Enter the value and press Enter or click Next to proceed. Out-of-tolerance values are highlighted.

Order by Tool

When Order by Tool is selected:

  • Dimensions are grouped by measurement tool
  • Complete all dimensions for one tool before moving to the next
  • Reduces tool switching time
  • More efficient for batch measurements

Example: All caliper dimensions first, then all CMM dimensions.

Design Mode

If nominal/tolerance values are missing, Design Mode lets you enter them:

  • Nominal: The target dimension value
  • Tol+: Upper tolerance (positive)
  • Tol-: Lower tolerance (negative)

These values are saved to the report and used for OOT calculations.

Mobile Wizard

On mobile devices, the wizard provides:

  • Full-screen interface for focused entry
  • Large numeric keyboard for easy tapping
  • Swipe gestures for navigation
  • Haptic feedback on supported devices

The mobile wizard is optimized for shop floor use with gloves or in challenging conditions.

Report Details & Editing

Display Modes

Switch between different views of your measurement data:

  • Results: Shows actual measured values
  • Deviation: Shows difference from nominal (actual - nominal)
  • Error: Shows percentage error from nominal
  • Min/Max: Shows range across all samples. Text rows show their first filled S.N. value; you can edit that text for the PDF you are about to export, but the edit is not saved.
  • Critical Dim: Shows critical dimensions
  • Statistics: Shows mean, std dev, Cp, Cpk

Select the mode from the dropdown in the report toolbar.

Sample Numbers (SN)

Manage multiple samples for each dimension:

  • Sample Size: Set total number of samples in report settings
  • SN Columns: Each sample gets its own column (SN1, SN2, SN3...)
  • Navigation: Use SN selector to show specific sample columns
  • Per-page: Configure how many SN columns to show at once

Data entry can be done per-sample or via the Wizard mode.

Critical Dimensions

Mark dimensions as critical for special attention:

  • Click the star icon next to a dimension row
  • Critical dimensions are highlighted in the table
  • Filter by critical in the Wizard mode
  • Critical status appears in PDF exports

Use this for safety-critical or customer-specified important dimensions.

Out of Tolerance (OOT) Panel

When measurements exceed tolerance limits:

  • The cell is highlighted (color configurable in Admin)
  • OOT Panel appears at the top of the table with the correction tools
  • Select rows first: while the panel is open, every row shows a checkbox in the Dim No column and the header has a select-all box. Correct Selected, the slider and AutoFill act only on the ticked rows. With nothing ticked the buttons are disabled and nothing changes.
  • Correct Selected (n): replaces out-of-tolerance values in the ticked rows with in-tolerance values and fills empty cells. Restore Original brings the values back.
  • Correction range: the slider adjusts the ticked rows by a percentage of their tolerance
  • Decimals: corrected values are rounded to the tool's precision set in Admin → Measurement Tools, or to the toolbar precision when the tool has none
  • Save to DB stores the result; closing the panel discards it

Enable/disable the OOT panel in Admin → Display Settings.

Report Locking

Lock reports to prevent accidental changes:

  • Open the report Actions menu (☰) and click Report is Unlocked / Report is Locked to toggle
  • Locked reports cannot be edited. Delete on the report and on Kanban cards is off while it is locked.
  • Moving a report to Done on the board or in the Report Details panel locks it automatically; moving it out of Done there unlocks it
  • User: can lock or unlock reports they created or inspect
  • PowerUser: also reports of their group members
  • Admin: any report in the organization
  • In Report Search you can lock or unlock several reports at once

Locking preserves the report state for audit purposes.

Adding Measurement Rows

Add new dimensions to your report:

  1. Click Add Row button below the measurement table
  2. Enter dimension number (Dim No)
  3. Select measurement type (Diameter, Position, etc.)
  4. Enter nominal value and tolerances
  5. Select measurement tool (optional)
  6. Mark as critical if needed

Rows can be reordered by dragging or sorted by Dim No.

Document Attachments

Attach supporting documents in the Report Details panel under Documentation:

  • Drawing: engineering drawings (PDF or image)
  • Materials: material certificates, test reports
  • Misc: any other documents
  • CMM Files: machine files you imported are stored here automatically

Drop a file, click to choose one, or paste with Ctrl+V. Each file can be up to 5 MB. A report holds up to 10 documents across these four categories. Part Image and 3D Model have their own slots. Documents can be merged into one PDF with Export All.

Attaching and Opening the Drawing

  • No drawing yet: the report toolbar shows Upload Drawing. Click it and choose a PDF or image of the part drawing, up to 5 MB. After the upload you go straight to the Canvas.
  • Drawing attached: the button becomes Go to Drawing. Click it to open the drawing on the Canvas.

You can also add drawings and other files in the Report Details panel under Documentation.

Changing the Status from the Report

In the Report Details panel, the status dropdown sits next to Save Changes. Pick To Do, In Progress, For Review or Done. The change is saved immediately; Save Changes is only for the other fields.

Moving a report to Done locks it. Move it out of Done to edit it again.

Part Image

Add a photo of the part to a report:

  • When creating the report: the Create New Report dialog has a Part Image tile. Drop an image on it, click it to choose a file, or press Ctrl+V to paste one. It uploads right after the report is created.
  • Later: in the Report Details panel use Upload Part Image. Use Remove image to delete it.

JPG, PNG or WebP, up to 5MB. The part image also shows as a thumbnail on report group cards.

Renaming an S.N. Column

  1. Click the ⋮ button in the S.N. column header.
  2. Choose Rename.
  3. In the Rename S.N. column dialog, type the new name and click OK.

If the name is already used you see a warning and nothing changes. The same menu also has Duplicate, Order S.N. Columns and Delete.

Merging Two S.N. Columns

Combine two S.N. columns into one, for example when the same part was measured in two columns.

  1. In the measurement table, click ⋮ next to the first S.N. column header and choose Select for Merge.
  2. Do the same for the second S.N. column.
  3. Click Merge S.N. X + Y above the table.
  • The values of the second column move into the first, row by row. No rows are added or removed.
  • If a dimension has different values in both columns, nothing is merged and Cannot merge lists those dimensions. Clear one of the two values, then merge again.
  • Available on the Pro plan.

Working with Many Parts (S.N. Columns)

On reports with more than 10 S.N. columns (more than 6 on smaller screens):

  • Dim No, Nominal, Tol+ and Tol-/Dtm stay fixed on the left and Tool on the right while the S.N. columns scroll sideways.
  • First, Previous, Next and Last arrows above the table jump 10 S.N. columns at a time and show which S.N. names are in view.
  • On the Canvas, the S.N. picker is searchable.

Deleting and Restoring Reports

  • Delete: use Delete Report in the report Actions menu, Delete on a Kanban card menu, or select reports in Report Search. On the report and on Kanban cards, Delete is off while the report is locked.
  • A deleted report is kept for 90 days and can be restored during that time. After 90 days it is deleted permanently.
  • Restore (Admin): on the Report Search page turn on Show deleted, click Restore and choose the status to restore the report to.

Users and PowerUsers can delete reports they created or are the inspector of. Admins can delete any report in the organization.

Sharing & Collaboration

Public Sharing

Share reports with external parties without requiring login:

  1. Open the report and click Share button
  2. Toggle Enable Public Sharing
  3. Optionally set an expiration date
  4. Copy the generated link
  5. Share the link with customers, auditors, etc.

Public links provide read-only access to the report.

Share Settings

Configure sharing options:

  • Expiration: Set when the link stops working
  • Allow Clone: Let viewers copy the report to their account
  • View Count: Track how many times the link was accessed

Revoke access anytime by disabling public sharing.

Inspector Assignment

Assign reports to different inspectors:

  • Users: Can only be assigned to themselves
  • PowerUsers: Can assign to themselves or group members
  • Admins: Can assign to anyone in the organization

The assigned inspector appears on the report and in PDF exports.

Units & Precision

Measurement Units

Choose between measurement units:

  • Millimeters (mm): Metric system, default
  • Inches (in): Imperial system

Set the unit when creating a report or change it in report settings. The unit applies to all dimensions in the report.

Decimal Precision

Choose how many decimal places to show with the precision selector in the report toolbar:

  • 0 to 5 decimals: values are rounded for display
  • None: no rounding. Values stay exactly as entered (2.340 stays 2.340, 2.3 stays 2.3)
  • Defaults: 3 decimals for mm, 4 for inch

None also keeps values exactly as they come from a machine file or AI Detect, in the table, Canvas, Wizard, PDF and Excel. Pass/fail is calculated the same way in every mode.

Statistics & Analysis

Statistical Calculations

For each dimension with multiple samples:

  • Mean (X̄): Average of all measurements
  • Range (R): Max value - Min value
  • Std Dev (σ): Standard deviation

View statistics in the Statistics display mode.

Process Capability (Cp/Cpk)

Measure how well your process meets specifications:

  • Cp: Process capability (spread vs tolerance)
  • Cpk: Process capability index (accounts for centering)

Interpretation:

  • Cpk > 1.33: Process is capable
  • Cpk 1.0-1.33: Process needs monitoring
  • Cpk < 1.0: Process needs improvement

Requires at least 2 samples for calculation.

Bonus Tolerance

For geometric dimensions with MMC (Maximum Material Condition):

  • Bonus tolerance is calculated based on actual feature size
  • Toggle Show Bonus Adjusted in report settings
  • Affects OOT highlighting when enabled

Common for position tolerances in GD&T.

Projects

What are Projects?

A project is one manufacturing order or job. It holds the parts you make, their process steps and batches, the production schedule, project documents and team notes.

  • Track progress of every part and batch through each operation
  • Plan with the production schedule
  • Print Route Cards that travel with each batch
  • Link inspection reports to the steps where they are made
  • See status of all projects on the Projects board

See the Manufacturing (MES) section for the full guide.

Creating a Project

To create a new project:

  1. On the Dashboard, switch the view to Projects
  2. Click + New Project
  3. Fill in the project fields your organization uses, for example Project Number, Name (required), Customer, Order No., Priority, Planned Start, Planned End, Project Lead and Description
  4. Click Create Project

The new manufacturing project opens so you can add parts. It starts in the To Do column of the Projects Board.

If Quotations are turned on, Admins also see Create a quote in the dialog. Tick it to write a quote instead, without creating a project. You can convert the quote to an order later.

Switching Between Reports and Projects View

The Dashboard has a toggle above the board:

  • Reports: report cards on the report workflow board
  • Projects: the Projects board with your manufacturing projects

In Projects view the cards above the board change too: + New Project and, for Admin and PowerUser, Search Projects. Your last choice is remembered.

If there is no Projects tab, manufacturing is not included in your organization's plan.

Project Kanban Board

The Projects Board shows your projects by status:

  • Four columns: To Do, In Progress, For Review, Done
  • Drag and drop: Admin and PowerUser can move project cards between columns to change the status
  • Project cards show the project name and fields, steps progress and finished reports
  • Done column: shows projects finished in the last 2 weeks. Older ones are counted at the bottom of the column. Projects that have parts can still be found in Project Search.
  • Projects In Quotation or Archived are not on the board

Admins also see each project's Order Value and column totals (see Order Value and Hiding Amounts).

Click any project card to open the project.

Linking Reports to a Project

Reports are linked to manufacturing projects through their steps:

  • In a step's Report field, pick an existing report or create one for the step (see Step Details and Recording Work on a Step)
  • A report created from a step belongs to that project and gets the part's drawing file attached
  • On the Reports board, such a report's card shows Project / Part; click it to open the part

To label reports freely without a project, use Report Groups (see Report Status & Kanban).

Older projects created before manufacturing projects were introduced still use Add Report in their details window.

Auto-Group Rules (Older Projects)

Auto-group rules exist only on older projects created before manufacturing projects were introduced. Open such a project, and under Grouping Rules click Run Now to assign matching reports by customer, order number or drawing number.

Manufacturing projects link reports through their steps instead.

Project Detail View

Clicking a project card opens the project page with its parts, documents, notes, schedule and summaries. See The Project Page in the Manufacturing (MES) section.

Older projects created before manufacturing projects were introduced open a smaller details window instead, with project info, grouping rules, the list of reports and documents.

Project and Part Documents

Attach files where they belong:

  • Project Documents (project page, left panel): POs, specs, work instructions for the whole order
  • Part Documents (part page, left panel): files for one part

Drag files onto the section or click +. Click a file to open it, or use its buttons to download or delete it.

Everyone who can see the project can open its documents. Those who can edit the project or part can add and delete them. Documents are separate from report attachments and never print on the Route Card.

Internal Notes

Every manufacturing project has an Internal Notes section at the bottom of the left panel, under Project Documents.

  • Click the header to expand it and type. Notes save by themselves a second after you stop typing; Saved appears when done.
  • The section remembers whether you left it open, and a small dot on the collapsed header shows that notes exist.
  • Anyone who can edit the project can write notes; others see them read-only.
  • Notes are for your team only. They never appear on the Route Card or any customer-facing document.

Adding a Part: Drawing Number Suggestions

When you add a part to a project and type its Drawing Number, a list of matches appears after two characters:

  • Existing parts from any project in your organization, with the part and project name
  • Reports with that drawing number, with part name, revision and date

Pick a match with the mouse or the arrow keys and Enter. Typing an exact match and leaving the field counts as a pick.

  • Part match: choose Use as template to copy the part's name, revision, material, notes, custom fields, process flow (route steps) and its drawing file and image, or Fill fields only to copy just the fields. Part number, quantities, stock, dates and material allocation are never copied.
  • Report match: choose Pull details from report to fill part name and revision and copy the report's drawing file and part image.

Copied files become the new part's own files, so later changes or deletion of the source do not affect it. Filled fields flash briefly, and a copied drawing shows its name in the upload slot where you can still replace it.

Finding Projects and Reports

Ways to find projects and the reports in them:

  • Project Search: Admin and PowerUser can search all parts across projects, filter by project status and change the status of many projects at once (see Project Search: Status and Bulk Status Change)
  • Report Search: the search table includes a Project column to filter reports by project
  • Projects Board: browse active projects by status
  • Report Cards: report cards on the kanban show which project they belong to

Unassigned reports (not in any project) can be found by filtering for an empty project field in Report Search.

Project Statuses: In Quotation and Archived

Besides the four board statuses (To Do, In Progress, For Review, Done), a project can be:

  • In Quotation: not ordered yet
  • Archived: kept for reference, out of the way

These projects do not appear on the Projects Board. To find them, open Project Search and pick the status in the Status filter (archived projects show only when you filter for Archived). Project Search lists projects through their parts, so a project with no parts does not appear there.

Allowed moves:

  • Only a To Do project can be moved to In Quotation, and it leaves In Quotation only back to To Do.
  • Any project can be archived. An archived project can return to To Do or In Quotation.

For Admins, a project in quotation lists its quotes in the left panel; click one to open it in the CRM. Reports created from such a project start in To Do.

Project Search: Status and Bulk Status Change

On the Dashboard in Projects view, click Search Projects (Admin and PowerUser). The table lists every part with its project's fields.

  • Status is the first column. Filter it to one status, or keep All.
  • When your organization uses quotations or has archived projects, the status filter also offers In Quotation and Archived, and All (except archived) hides archived projects.

To change the status of several projects at once:

  1. Tick the checkbox on a row. All rows of that project are selected. The header checkbox selects every project on the page.
  2. In the bar above the table, click the new status
  3. Projects where that move is not allowed are skipped, and a message tells you how many

The selection clears when you change page, filter or sort.

Order Value and Hiding Amounts

Admins can record what each project is worth.

  1. Open the project
  2. In the left panel, under Order Value, type the amount and pick the currency
  3. Press Enter or click elsewhere to save. Empty the box to remove the value.

On the Projects Board:

  • Each card shows its Order Value
  • Each column header shows a Total per currency. Hover it to see how many projects have a value.

Order Values are visible to Admins only.

Hide amounts: when Order Values are shown, the button above the board switches between Hide amounts and Show amounts. Hidden amounts show the currency but no digits, which is useful on a shared screen. The choice is remembered on this browser.

Invoices and Quotes on the Project Page

For Admins, the project page left panel shows the commercial side of the order:

  • Create invoice: starts an invoice from the project's parts (see CRM: Creating an Invoice)
  • Invoices: each invoice of the project with its status and the amount still due. Click one to open it in the CRM.
  • Quotes: for a project in quotation, its quotes with total and valid-until date

Other roles do not see these sections.

Manufacturing (MES): Parts, Batches, Route Cards

Manufacturing (MES) at a Glance

QA Report's manufacturing module tracks an order from the first operation to the last, on the shop floor.

How it is organized:

  • Project: one customer order or job
  • Parts: the items the project makes, each with its drawing file, image, quantities and documents
  • Process Flow: the ordered list of steps (operations) a part goes through, for example Material Order, CNC Milling, Inspection
  • Batches: groups of pieces that move through the steps together. Each batch shows its progress on every step.
  • Route Card: the printed form that travels with a batch

Where to find it: on the Dashboard, switch the board from Reports to Projects. Click a project card to open the project, then click a part to open the part page.

If you do not see the Projects tab, manufacturing is not included in your organization's plan. Contact support to enable it.

Who Can Do What in Manufacturing

What you see and can change depends on your role and your groups.

Admin

  • Sees every project
  • Can do everything below, plus split, merge and delete batches, see Cost Estimation and Order Value, and change the manufacturing settings in the Admin panel

PowerUser

  • Sees projects whose Project Lead shares at least one group with them
  • Can create and edit projects, parts, batches and steps, and sees the production schedule
  • Can fill any step, edit or delete completion entries, pass a partial step through and recover rejected parts

User (operator)

  • Sees only projects where at least one step is assigned to one of their groups
  • Can fill in only the steps assigned to their groups. Steps with no group assigned are closed to them.
  • Cannot create or change projects, parts, batches or steps, and does not see the schedule

Project Lead: the Project Lead can also add, edit and delete that project's parts, documents and notes, and split, merge and delete its batches. A Project Lead with the User role sees the project only if one of its steps is assigned to their group, and cannot change Project Details.

Groups are managed in Admin Panel > Org & Users & Groups.

Creating a Manufacturing Project

  1. On the Dashboard, switch to Projects
  2. Click + New Project
  3. Fill in the fields. By default these are Project Number, Name, Customer, Order No., Priority, Planned Start, Planned End, Project Lead and Description. Name, Order No. and Project Lead are required.
  4. Click Create Project

The Project Lead matters: PowerUsers in the lead's groups can see the project, and the lead can manage its parts and batches.

Admins can rename, reorder, hide or add project fields in Admin Panel > Manufacturing > Project Fields. The Card option there chooses which fields show on the project card.

Admin and PowerUser can create projects.

The Project Page

Click a project card on the Projects board to open it.

Left panel

  • Project Details (Admin and PowerUser): the project fields. Click the pencil to edit.
  • Project Parts: every part with its image and name. Click a part to open it. The ... menu edits or deletes a part. A part marked Needs details still needs its part number, drawing or material.
  • Project Documents: drag files here or click + to attach POs, specs or work instructions
  • Internal Notes: notes for your team only

Main area

  • Production Schedule: a timeline of the parts (see Production Schedule)
  • Production Summary, Parts Overview and Quality Summary: pieces per step, progress per part, and passed versus rejected pieces

Admins also see the project's Order Value in the left panel.

Adding a Part

On the project page, click + next to Project Parts (or Add Part). The dialog has three tabs.

Part Details

  • Fill in the part fields, for example Name, Part Number, Drawing Number, Revision, Material, Quantity Required, Stock Qty, Planned Start, Planned End and Notes. Required fields are marked.
  • Part Number is required unless it is an Auto Increment field.
  • Upload the part's drawing file. It is required, and it is attached automatically to reports you create from the part's steps. A drawing image (JPG, PNG) can be up to 5 MB; for a larger drawing use a PDF.
  • Part Image: click the box, drag an image onto it, or press Ctrl+V to paste a screenshot. JPG, PNG, GIF or WebP, up to 5 MB.
  • A field marked AUTO fills itself in when the part is saved.
  • Typing a Drawing Number suggests existing parts and reports (see Adding a Part: Drawing Number Suggestions)

Materials Required: take material for the part from Inventory Control

Minimum Stock Alert: get warned when the part's finished stock runs low

Click Add Part to save. Admin and PowerUser can add parts. Admins choose which part fields exist in Admin Panel > Manufacturing > Part Fields.

The Part Page

Click a part on the project page to open it.

Left panel

  • Part Image: click it to change it, or press Ctrl+V anywhere on the page to paste a new image. Pasting replaces the current image.
  • Part details and Required Quantity
  • Stock Material bar: how much extra stock you have against the required quantity (see Stock Qty)
  • Batches: every batch with its quantity. Click a batch to edit it, or Add Batch.
  • Part Documents: files for this part only
  • Cost Estimation (Admin only)

Main area

  • Schedule: the batch timeline. It starts hidden; click Show Schedule in its header to open it.
  • Process Flow: a table with one row per batch and one column per step. Each cell shows that batch's status on that step.

Click the pencil next to Part Details to edit the part (Admin and PowerUser).

Building the Process Flow

The process flow is the list of steps for one part.

  1. On the part page, click Add Step in the Process Flow header
  2. Click a step from your organization's step library. It is added at the end with its fields, statuses and default assignment.
  3. Repeat for each operation

Each step column header has a menu with Step Details (change the step for this part only) and Delete Step. Drag a column to change the order. A step that already has completion data cannot be moved.

A colored bar under the step name shows its ETA, and small icons show who it is assigned to.

If the library is empty, ask an Admin to add steps in Admin Panel > Manufacturing > Process Steps.

Admin and PowerUser can change the process flow.

Step Details: Assignment, Fields and Report

Open a step column's menu and choose Step Details. Changes apply to this part only; the library stays as it is.

  • Name, Color, Description
  • Cost and ETA: override the library cost for this part. A per-hour cost needs an ETA.
  • Assign Operators and Assign Groups: Users with the User role can only fill steps assigned to one of their groups. The Operator list when filling the step is limited to the assigned operators and group members.
  • Fields: the data collected at this step. Types: Text, Number, Date, Checkbox, Select, URL, File, Report. Tick Req to make a field required.
  • Statuses: each status has a type: Initial, In Progress or Completed

Picking a Report for a step: on a Report field, search for an existing inspection report or create a new one. It is preselected for every batch of this part. The operator can still change it, and steps already filled keep their own report.

When you pick a report you can Attach as-is or Use as template (a new empty report is created from it). Create report for this step starts a new report with the part's drawing file already attached.

Creating and Managing Batches

A batch is a group of pieces that goes through the steps together.

Add a batch

  1. On the part page, click Add Batch
  2. The batch name is filled in for you from your organization's naming pattern. You can change it.
  3. Quantity starts at what is still unallocated. The dialog shows Total required, Allocated and Remaining. If Stock Qty is higher than the required quantity, you can allocate up to the stock.
  4. Set Planned Start and Planned End, then click Add Batch

In the Process Flow table

  • The ... menu next to a batch name offers Print Route Card, Split Batch, Merge Batch and Delete Batch
  • Sort batches By Name, By Quantity or By Date
  • Hide Done is on by default: batches whose steps are all completed are hidden. Click Show Done to see them.
  • Rejected pieces show in brackets after the batch quantity

Deleting a batch returns its quantity to unallocated. Admin and PowerUser can add batches. Split, merge and delete are for Admins and the project's Project Lead.

Recording Work on a Step

Click a cell in the Process Flow table to record work on that step for that batch.

  1. Choose the Status
  2. Fill in the step's fields
  3. Under Completion Entries, choose the Operator, enter Comp (completed) and Rej (rejected) quantities and the Date, then click Add. Typing a rejected quantity fills in the completed quantity for you.
  4. Add more entries as work continues. Remaining shows what is left.
  5. Click Save

Good to know:

  • Each step receives the pieces completed at the step before it. You cannot enter more than remain.
  • If the operator has a PIN, they confirm the save with their PIN or password (3 attempts).
  • Setting a Completed status with pieces still remaining: a User's remaining pieces are recorded as completed; Admin and PowerUser are asked about partial completion.
  • Admin and PowerUser can edit or delete entries. An entry cannot be changed while a later step already has entries; clear the later step first.
  • Deleting all entries resets the step.

Hover a cell to see who submitted it and when.

Rejected Pieces and Rejection Reasons

When a completion entry has a rejected quantity, a Select Rejection Reason window opens. Pick a category, then a reason in it. Closing the window without a reason discards that entry.

Where rejections show up:

  • In the step's entries and in brackets after the batch quantity
  • In the Quality Summary on the project page
  • On the Route Card, with the reason in the Notes column

Reasons stay with the pieces when a batch is split or merged.

Admins set up the categories and reasons in Admin Panel > Manufacturing > Rejection Reasons. Every organization starts with a ready-made list. If all categories are removed, no reason is asked for.

Recovering Rejected Pieces

A rejected piece that is reworked or found acceptable can go back into the process.

  1. Open the step where the pieces were rejected
  2. In Completion Entries, click the rejected quantity of the entry
  3. In Recover rejected parts, enter the Quantity, choose a Reason and add an optional Note, then click Add

The recovered pieces count as available again, and the step reopens so they can be completed. The cell shows a small recovery marker.

Admin and PowerUser can recover pieces. Admins set the recovery reasons in Admin Panel > Manufacturing > Rejection Reasons, under Recovery Reasons. Tick Print recovered quantities on Route Card to show them on printed Route Cards.

Partial Completion (Sample Inspection)

Sometimes you check only a few pieces and pass the whole batch, for example inspecting 3 out of 100.

When an Admin or PowerUser saves a step with a Completed status while pieces remain, a Partial Completion window asks: *Only 3 of 100 completed. Pass all 100 to the next step?*

  • Yes, pass all through: the step is marked completed and all pieces, except the rejected ones, move to the next step
  • Cancel: nothing is saved, so you can keep entering work

For Users, remaining pieces are recorded as completed automatically.

Splitting and Merging Batches

Split a batch

  1. In the Process Flow table, open the batch's ... menu and choose Split Batch
  2. Set Split into to the number of sub-batches
  3. Check the name and Quantity of each sub-batch. The Sum must match the original quantity exactly.
  4. Click Split

Progress already recorded is shared out between the sub-batches in proportion to their size, with whole numbers that always add up. Sub-batches appear indented under the original. A batch whose steps are all completed cannot be split.

Merge two batches

  1. Open the ... menu of one batch and choose Merge Batch
  2. Click the other batch in the table
  3. Check which batch is kept. Use Swap to change it. The dialog shows the Combined quantity.
  4. Click Confirm Merge

Both batches must be of the same part, and every step must have the same status in both. The batch that is merged in is permanently deleted.

Split and merge are available to Admins and the project's Project Lead.

Stock Qty, Inventory Pieces and Low Stock

Stock Qty on a part is how many pieces you have to work with. Anything above Quantity Required is your buffer against rejects.

  • On the part page, the Stock Material bar shows the buffer: extra pcs, No buffer! or short!, and how many rejected pieces it has already used.
  • When you take material in pieces from Inventory Control for a part, those whole pieces are added to the part's Stock Qty when you save. Returning material does not lower Stock Qty.
  • If Stock Qty would end up below the required quantity, a warning lets you Go back or Save anyway and add stock later. If it equals the required quantity, you are told there is no buffer for rejects.

To be warned automatically when a part's finished stock runs low, use the Minimum Stock Alert tab in Add Part or Edit Part.

Printing Route Cards

A Route Card is the printed form that travels with a batch on the shop floor.

One batch: open the batch's ... menu in the Process Flow table and choose Print Route Card.

All batches: click Print All in the Process Flow header.

Then choose:

  • Filled: with the batch data recorded so far
  • Empty: a blank form to fill in by hand

The PDF opens in a new browser tab, where you can print or save it. The layout comes from your organization's Route Card template.

Internal Notes never appear on a Route Card.

Designing the Route Card Template (Admin)

Admins design the Route Card in Admin Panel > Manufacturing > Route Card Template.

  • Page Header and Page Footer: turn on Logo, Org Name, Title, Page #, Print Date and Custom Text
  • Choose Portrait or Landscape, and LTR or RTL for right-to-left languages
  • Build the page from blocks: Header Banner, Info Grid, Barcode, Steps Table, Free Text, Separator, Signature Line and Part Image
  • Drag fields from Available Fields (Project, Part, Batch, System) into a block
  • Barcode: Code 128 or QR Code. Encode the batch number so it can be scanned in Batch Lookup.
  • Steps Table: built-in columns (#, Operation, Performed By, Qty, Date, Notes) plus your Step Fields and Shared Fields. Add empty rows for handwritten entries.

Click Preview to see a sample PDF, then Save Template.

Which step fields can print is set with the RC tick box on each field in Process Steps.

Process Steps Library (Admin)

Admins define the steps every part can use in Admin Panel > Manufacturing > Process Steps.

For each step:

  • Name, Color and Description
  • Fields: the data operators fill in. Types: Text, Number, Date, Checkbox, Select, URL, File, Report. Each field has Req (required), a Default value and RC (print on the Route Card).
  • Statuses: for example Queued, Running, Complete. Each one is Initial, In Progress or Completed.
  • Cost & ETA: a cost Per Hour, Per Part or Per Step, with currency. The ETA is set per part.
  • Default Assignment: users and groups assigned automatically when the step is added to a part

Shared Fields: fields added here appear in every step, for example Machine or Notes. In each step you can hide a shared field with the eye button or give it a default value.

Click Save. A step already on a part keeps its own settings for that part. New fields you add to a library step also appear in that step's Step Details on existing parts.

Part Fields and Batch Naming (Admin)

In Admin Panel > Manufacturing > Part Fields, Admins choose the fields on the Add Part and Edit Part forms.

  • Rename, reorder, hide or make fields required. Core fields (with a lock) cannot be deleted.
  • Add custom fields: Text, Number, Date, Select, Textarea, Auto Increment, Constructor
  • Subtitle: show a field, such as the drawing number, under each part's name on the project page
  • Wide: make a field take the full width of the form

Batch names: the Batch field uses the Constructor type. Build the pattern from pieces: part fields, free text, separators and an automatic counter. Example: Part Number + "-" + counter gives P-1001-1, P-1001-2 and so on. New batches get the next name automatically.

Auto Increment fields (for example a part number) fill in the next number when the part is saved.

Project fields work the same way in Project Fields.

Production Schedule (Gantt)

The schedule shows planned dates as bars on a timeline.

  • On the project page it shows each part. On the part page it shows each batch and starts hidden; click Show Schedule in its header.
  • Drag a bar to move it, or drag either end to change the start or end date. The new dates are saved.
  • Use Zoom in, Zoom out and Fit all. The Today line marks the current date.
  • Hide Schedule collapses it again.

The schedule is shown to Admin and PowerUser. Dates can be changed by those who can edit the project or part. It is not shown for projects in quotation or archived.

Batch Lookup and Shop-Floor Mode

Batch Lookup takes an operator straight to one batch, ideal for a shared tablet or PC with a barcode scanner.

  1. On the Dashboard, click Batch Lookup
  2. Scan the barcode on the Route Card, or type at least two characters of the batch number
  3. With one match, the batch opens automatically. Otherwise pick it from the list with the mouse or arrow keys and Enter.

The barcode may contain more than the batch number, for example order and batch joined by dashes. Batch Lookup finds the batch inside it.

The batch opens in shop-floor mode: only that batch's row in the Process Flow, with editing tools hidden. The operator clicks a step, records the work and saves, and the screen returns to Batch Lookup. After 5 minutes without activity it also returns there.

Batch Lookup is available to every role. What the operator can fill in still follows their role and step assignment.

Cost Estimation (Admin)

When steps have a cost in the Process Steps library, the part page shows Cost Estimation to Admins:

  • Cost / Part and Total Cost (cost per part times the required quantity)
  • A per-hour step needs an ETA on the part, set in Step Details. While any is missing, the totals show N/A and Some steps missing ETA appears.

Admin and PowerUser can override a step's cost and ETA for one part in Step Details. Only Admins see the totals.

CRM: Customers, Quotes, Invoices

What is the CRM?

The CRM keeps the commercial side of your work in one place: your customer list, quotes, invoices, payments and shipments.

  • Who can use it: Admin only. Other roles do not see the CRM.
  • Where: on the Dashboard, open the Admin Tools menu in the header and choose CRM.
  • Left menu: Customers, Invoices, Quotations (only after Quotations are turned on in Settings) and Settings.

Each list opens a details panel below the table when you click a row. Use the collapse button on the panel to close it.

Adding and Editing Customers

To add a customer:

  1. Open CRM > Customers
  2. Click Add Customer
  3. Enter the Name and the Alias (both required). The alias starts as the name and stops following it once you change it.
  4. Optionally fill in Code, Contact Person, Email, Phone, Address, Country, Website, Payment Terms, Tax ID, Currency and Notes
  5. Choose where the customer is offered under Show in (see Customer Visibility)
  6. Click Add

To edit a customer, click its row. The details panel shows Details, Contact Information and Business Details; click any value to change it.

  • Filter and sort the table by any column. The status filter shows Active, Archived or All customers.
  • Payment Terms and Currency are used as defaults when you invoice this customer. For example "Net 45" sets the due date 45 days after the invoice date.

Archive or delete: a customer that was never used on a report, project, quote or invoice can be deleted. Once it is used, choose Archive instead: it is hidden from the list and cannot be picked on new reports or projects, but existing links stay. Use Restore to bring it back. To archive or delete many customers at once, see Selecting Several Customers.

Customer Names and Aliases

Every customer has a real Name and an Alias.

  • Only the CRM page (Admin) shows the real name. Everywhere else, customer lists on reports and projects show the alias.
  • Use a different alias to hide who the customer is from your team, for example "Customer A". The table then shows a Masked badge.
  • Two customers may share an alias. You get a warning so you can check it is intended.

Renaming an alias: when you change the alias in the customer panel, the Customer field is updated on every report and project linked to that customer. A message tells you how many were updated. Locked reports keep the previous name.

Invoices, quotes and packing lists are for the customer, so they print the real name.

Customer Visibility in Reports and MES

Each customer has two switches under Show in:

  • Show in Reports: the customer is offered in the customer list on reports
  • Show in MES: the customer is offered in the customer list on manufacturing projects

The table shows Reports only, MES only or Not in pickers when a customer is not offered everywhere. A customer that is not in any picker stays in the CRM and can be shown again later.

Selecting Several Customers

To archive, restore or delete many customers at once:

  1. Open CRM > Customers
  2. Tick the box at the start of each row you want. The box in the header selects every customer shown by the current filters.
  3. A bar above the table shows how many are selected, with Archive, Restore (when archived customers are selected), Delete and Clear selection
  4. Choose the action and confirm

Delete: customers that were never used are deleted permanently. Customers used on a report, project, quote or invoice cannot be deleted, so they are archived instead. The confirm window shows how many of each.

Tip: filter the table first (for example by Country, or set the status filter to Archived), then use the header box to select only those customers.

Importing Customers from Excel or CSV

Bring your customer list from Excel or another CRM. Nothing is saved until you click Import.

Who can import: Admin by default. Other roles can be given access in Admin > Access.

  1. Open CRM > Settings > CRM Import
  2. Upload: drop a .xlsx or .csv file. The first row must hold the column names. For an Excel file with several sheets, choose the sheet.
  3. Match columns: each file column is matched to a CRM field automatically. Change the match, uncheck a column to leave it out, or choose + New field to keep it as a new customer field. One column must be matched to Name. For date columns, choose whether the day or the month comes first.
  4. Duplicates: customers already in your CRM are listed. Choose Keep to leave one as it is, or Update to write the new values. An empty cell never erases a value. Update all and Skip all apply to every row.
  5. Confirm: check the counts and any rows with errors. Choose where the new customers are offered: Show in Reports and Show in MES. Click Import.

If the Alias is not matched, each alias is the same as the name.

Undo: the last import can be undone from the Last import box. Added customers are removed and updated customers get their old values back. Customers edited after the import, or already used on reports, projects, quotes or invoices, are left as they are.

CRM Fields: Your Own Customer Fields

Open CRM > Settings > CRM Fields to choose which customer fields are shown and to add your own.

  • Add field: enter a name and a format: Text, Long text, Number, Date, Checkbox or List (enter the list options)
  • Shown: hide a field you do not use. Name and Alias are always shown.
  • Order: use the arrows to move a field up or down. Fields appear in this order in the customer panel and in the Add Customer form.
  • Rename a field at any time. Its format can only be changed if every existing value fits the new format.
  • Delete field: you see how many customers have a value in it first.

Click Save when done. Fields added during an import appear here too.

Picking a Customer on Reports and Projects

The Customer field on reports (Create Report and the report details panel) and on manufacturing projects (new project, edit project) is a searchable list of your CRM customers.

  1. Click the Customer field
  2. Type to filter the list, then click a customer
  3. To empty the field, choose Clear

Adding a new customer from the list (Admin and PowerUser): type the name and choose Add customer "name". The customer is created in the CRM and selected. An Admin can add the details later on the CRM page.

User role: type a name and choose Use "name" to keep it as plain text, without creating a customer.

If your organization has no customers yet, the field works as a normal text box.

Turning On Quotations

Quotes are off until an Admin turns them on.

  1. Open CRM > Settings
  2. Switch on Quotations
  3. Optionally set the Quote number prefix (for example Q-) and Quote valid days (how long a new quote is valid after its quote date)
  4. Click Save

After this, the Quotations tab appears in the CRM, and the new project dialog shows a Create a quote option.

Creating a Quote

A quote does not need a project. You turn it into an order later.

To create a quote:

  1. Open CRM > Quotations and click New quote. You can also click + New Project on the Dashboard and tick Create a quote.
  2. Pick the Customer
  3. For each part, enter the Part name, a Description, the Qty and the Price per part. Click Add part for more rows.
  4. Turn tax on or off and set the Rate % if needed
  5. Click Save as draft, or Save and mark sent when the quote goes to the customer

Tips:

  • While you type a part name, matching parts from your projects are suggested. Picking one fills in the last price you quoted for it, if any.
  • The currency comes from the customer, or from the default currency in Settings.
  • Every row needs a part name or a description. Empty rows are ignored.

Managing Quotes

CRM > Quotations lists your quotes with Number, Customer, Project, Quote date, Valid until, Total and Status.

  • Period: 1M, 3M, 6M, 1Y or Custom
  • Search and filters: search by number, customer or project; filter by status and customer
  • Summary tiles: Open quotes, Expiring within 7 days, Drafts not sent yet
  • Statuses: Draft, Sent, Converted

Click a quote to open its panel:

  • Edit (drafts only): change customer, dates, currency, tax, lines and terms: Customer RFQ reference, Lead time, Incoterms, Payment terms, Ship-to address and Notes
  • Mark sent: gives the quote its number and locks it
  • Copy: starts a new draft with the same lines and terms. Use it to make a new revision of a sent quote.
  • Convert to order: see Converting a Quote to an Order
  • Print and Export PDF
  • Delete (not for converted quotes). A deleted sent quote leaves a gap in the numbering.
  • Documents: attach files such as the customer's RFQ or drawings

Converting a Quote to an Order

When the customer accepts a quote:

  1. Open the quote in CRM > Quotations
  2. Click Convert to order
  3. Fill in the project fields (the same fields as a new project). The customer is taken from the quote.
  4. Click Create order

What happens:

  • A manufacturing project is created with one part per quote line, and opens.
  • A draft quote is marked sent first, so it gets a number.
  • The quote becomes Converted and read-only.

Needs details: parts made from a quote line show a Needs details badge on the project page. Click the part to open its edit form, add the part number, drawing and material, and save. The badge then goes away.

If a quote line was picked from an existing part, that part's details are copied to the new part.

Creating an Invoice

Invoices are created from a manufacturing project.

  1. Open the project
  2. In the left panel, click Create invoice
  3. Check the Customer, Invoice date, Due date and Currency
  4. Fill in the trade fields if you need them: Customer PO number, Incoterms, Payment terms and Ship-to address (leave it empty to use the customer address)
  5. Check the lines: description, part number, revision, quantity and price per piece. Use Add line or remove lines as needed.
  6. Click Save as draft, or Save and mark sent

Prefilled values:

  • Lines come from the project's parts. Each line shows the project quantity and how much is already invoiced.
  • If the project came from a quote, lines, prices and terms are copied from that quote.
  • The due date follows the customer's payment terms, or the Default due days in Settings.

An invoice gets its number when it is marked sent. Drafts show Draft instead of a number. A project's invoices are listed in its left panel; click one to open it in the CRM.

The Invoices List

CRM > Invoices shows Number, Customer, Project, Date, Due, Total, Paid, Balance and Status.

  • Period: 1M, 3M, 6M, 1Y or Custom
  • Search and filters: search by number, customer or project; filter by status and customer
  • Summary tiles: Open balance, Overdue, Paid

Statuses:

  • Draft: not sent yet, can still be edited
  • Sent: sent to the customer, waiting for payment
  • Partially paid and Paid: follow the payments you record
  • Overdue: shown when the due date has passed and a balance is left
  • Cancelled

A Shipped or Partially shipped badge shows how much of the invoice has been shipped.

Payments and Invoice Status

Click an invoice to open its panel.

Draft invoices: Edit changes lines and prices; Mark sent gives the invoice its number. Only drafts can be edited.

Recording a payment (sent or partially paid invoices):

  1. Click Record payment
  2. Enter the Amount (not more than the balance), Date, and optionally Method, Reference and Note
  3. Click Save payment

Payments are listed in the panel. Deleting a payment raises the balance again.

Other actions:

  • Cancel invoice: for drafts and unpaid open invoices. Delete the payments first if there are any. Restore brings a cancelled invoice back.
  • You can change the Due date and Notes of an invoice in the panel and click Save changes.
  • Delete: removes the invoice with its payments and files. A deleted sent invoice leaves a gap in the numbering. This cannot be undone.

Shipments and Packing Lists

You can ship an invoice in one go or in parts. Shipping is available once the invoice is sent.

  1. Open the invoice in CRM > Invoices
  2. In Shipments, click Generate shipment
  3. Each line starts at the quantity still to ship. Lower it for a partial shipment, and add a Lot number if needed.
  4. Enter the Ship date and optionally Carrier, Tracking number, Packages and Gross weight
  5. Click Create shipment

The shipment gets its own number and a packing list PDF is saved to the invoice documents. The packing list shows ordered, shipped now and remaining quantities, and a Received by / Date / Signature box.

  • Use the print button on a shipment to print it, or Regenerate PDF if the PDF was not saved.
  • Deleting a shipment removes it and its PDF, and its quantities can be shipped again.

PDFs, Documents and Terms

  • Print and Export PDF on a quote or invoice create a document with your company details, Bill to and Ship to, trade terms, lines and totals.
  • Drafts print with a DRAFT mark.
  • Once a quote or invoice is sent, its PDF keeps the customer and company details as they were when it was sent.
  • Documents: attach files to a quote or an invoice (for example the customer PO). Click a file to open it.

Terms and conditions: in CRM > Settings you can write separate terms for quotes, invoices and packing lists. They print on their own page at the end of the document. Leave a box empty for no terms page.

CRM Settings

Open CRM > Settings (Admin only). Click Save when done.

Invoices

  • Invoice number prefix and Number padding (4 means INV-0001)
  • Next invoice number: can only be raised, not lowered
  • Default currency
  • Enable tax, with a Tax label (for example VAT) and Tax rate (%)
  • Default due days: used when the customer has no payment terms
  • Footer text: printed on quotes and invoices

Quotes and shipments

  • Quotations on or off, Quote number prefix, Quote valid days
  • Shipment number prefix

Printed text

  • Quote, invoice and shipment terms and conditions
  • Bank details: printed on invoices

Report Status & Kanban

Report Statuses

Track report progress with four statuses:

  • To Do: New reports ready to start inspection
  • In Progress: Measurements actively being entered
  • For Review: Ready for quality review or approval
  • Done: Completed and approved reports. Moving a report to Done on the board or in the Report Details panel locks it. Change Status in Report Search does not lock it.

Change status by dragging cards on the Kanban board, with the status dropdown in the Report Details panel, or with Change Status in Report Search.

Using the Kanban Board

The Kanban board on the dashboard shows all reports:

  • Four columns: To Do, In Progress, For Review, Done
  • Drag and drop: Move cards between columns to update status
  • Report cards: Show key info (customer, part, drawing number) and the group tag when the report is in a group
  • Card menu (⋮): Duplicate, Template, Assign to Group, Delete
  • Done column: Shows reports completed in last 2 weeks

Click any card to open the full report.

Report Groups

Group related reports under a free-text label, for example a batch, a customer order or a campaign. A report can be in one group and still belong to a manufacturing project.

  • Assign to Group: open the card menu (⋮) on the kanban and choose Assign to Group (or Move to Group). Type to search existing groups or type a new name and press Enter to create it. Choose Remove from group to clear it.
  • Rename or delete a group: hover a group in the same dialog and use the pencil or trash icons. Renaming updates every report in the group; deleting only removes the label, the reports stay. Available to Admin and PowerUser.
  • Group tag: cards in a group show a small tag. Click it to see every report in the group, open any of them, remove one, or add a report by searching its drawing, order, customer or part.
  • Show in Groups: see all groups as cards on the dashboard (see Show in Groups View).
  • Search: the Group column on the Report Search page lets you filter and sort by group.

Show in Groups View

On the Reports board click Show in Groups to see one card per report group instead of the Kanban columns. Each card shows how many reports are in each status, the last activity and part image thumbnails. Click a card to open the group's report list.

A group is listed while it has a report that is not Done, or one finished in the last two weeks. Click Show Reports to go back to the Kanban. The board always opens in the Kanban view.

CMM Data Import

Importing CMM Measurements

Import measurement data from CMM (Coordinate Measuring Machine) files into an existing report:

  1. Open the report with dimensions already set up
  2. Open the Actions menu (☰) and choose Import Machine File (on the Canvas: Actions > Import Machine File, canvas unlocked)
  3. Select your CMM output file (any text file)
  4. The system parses and matches dimensions
  5. Review the import preview
  6. Confirm to apply measurements

The file is stored on the report under CMM Files.

Dimension Matching

The import system matches CMM data to report dimensions:

  • Automatic: Matches by dimension number (Dim No)
  • Manual: Review unmatched dimensions in preview
  • Partial: Import only matched dimensions

If dimensions don't match, verify Dim No numbering in both the report and CMM program.

Dimension Identifiers: lines starting with **DIM are read as dimensions. An Admin can add other labels in Admin > Report Fields Settings > Dimension Identifiers (e.g. D, DIMENSION), separated by commas. **DIM 1, **dim-1, **D1, **DIM_1 and **dim1 then all become Dim No 1. Case and the separator (space, -, _, .) do not matter. Only lines starting with ** are checked.

Import Summary

After import, a summary shows:

  • Number of dimensions matched
  • Number of values imported
  • Any unmatched or skipped dimensions
  • Warnings for out-of-tolerance values

Review the summary to ensure all expected data was imported correctly.

MCOSMOS Setup Guide

Step-by-step guide to configuring MCOSMOS software to generate output files compatible with QA-Report: serial numbers, part information, dimensions, GD&T tolerances, and manual measurements.

[Open MCOSMOS Setup Guide →](/help/mcosmos-setup)

Report Export/Import

Export/Import Overview

The Report Export/Import feature lets you download reports as portable ZIP archives and import them back. Use it to:

  • Back up important reports locally
  • Transfer reports between environments
  • Share report data externally

Each ZIP archive contains the full report data, all attached drawings, material certificates, miscellaneous files, and the part image.

Exporting Reports

To export reports:

  1. Go to the Search page
  2. Select one or more reports using the checkboxes
  3. Click Actions and choose Export Reports
  4. Click Start Export
  5. Each report downloads as an individual ZIP file to your Downloads folder

The export includes all report data (measurements, dynamic fields, balloon data) and all attached files. A progress bar shows the current status.

Importing Reports

To import a report from a ZIP file:

  1. Open the Create New Report dialog
  2. Click Import from ZIP
  3. Select a previously exported .zip file
  4. Review the preview (Part Name, DRW NO, REV, Customer, file count)
  5. Click Import Report

The imported report gets a new ID, is assigned to you as the inspector, and starts with Todo status. All files are re-uploaded to storage.

Feature Access

Report Export/Import is a plan-controlled feature. If the buttons appear greyed out, your subscription plan does not include this feature. Contact your administrator to upgrade the plan.

Troubleshooting

Reports Not Showing on Dashboard

Possible Causes:

  • Wrong time period filter selected
  • Inspector filter applied
  • No reports created yet

Solutions:

  1. Reset all filters to "All"
  2. Extend time period to "Last 1 year"
  3. Check if you have permission to view reports

PDF Export Not Working

Solutions:

  1. Ensure all required fields are filled
  2. Check browser pop-up blocker settings
  3. Try a different browser (Chrome, Firefox recommended)
  4. Clear browser cache and retry

Machine File Upload Issues

"No metadata found in file"

  • Check file has **FIELD: format (double asterisk)
  • Ensure metadata is at the top of the file

Dimensions missing or numbered wrong

  • Check that your dimension headers use a label from Dimension Identifiers (Admin > Report Fields Settings)
  • Check that a Comment mark is not hiding part of the file

"Inspector not found"

  • Inspector name from file may not match system users
  • Manually select the correct inspector from dropdown
  • Ask admin to add inspector to system

"File size exceeds 5MB limit"

  • Use a smaller or compressed file
  • Only metadata section is needed (trim excess data)

Login/Authentication Issues

  • Clear browser cookies and cache
  • Try incognito/private browsing mode
  • Check your email address is correct
  • Use "Forgot Password" to reset if needed

Drawing Upload Issues

  • Supported formats: PDF, PNG, JPG, WEBP
  • Maximum file size: 5 MB per file
  • If the file is larger, export the drawing as a compressed PDF or lower the image resolution
  • If PDF doesn't display, try converting to image format
  • Ensure PDF is not password protected

AI Detect Messages

  • AI Detect button missing: AI Detect is enabled per organization. Contact us to turn it on.
  • AI detection works on the primary drawing only: switch to the report's first drawing.
  • Select an S.N. column first: choose a part in Part Select at the top of the Canvas, then detect again.
  • No dimensions detected: draw a tighter box around the dimension text.
  • Too many requests: wait a minute and try again.
  • Canvas Locked: unlock the canvas (lock icon in the toolbar) before using AI Detect.

Subscription Plans

Free Plan

Get started with basic inspection capabilities:

  • 1 inspection report
  • PDF drawing ballooning
  • Basic measurement modes
  • Manage measurement tools

Basic Plan

Essential tools for growing QA teams:

  • Up to 50 inspection reports
  • PDF drawing ballooning
  • Interactive drawing mode
  • PDF settings & branding
  • Custom report fields
  • Report sharing
  • Document attachments

Pro Plan

Complete solution for enterprise QA operations:

  • Unlimited inspection reports
  • All Basic features plus:
  • Measurement wizard
  • All measurement modes & statistics
  • Out-of-tolerance correction
  • Report sharing & batch export
  • Team & group management
  • Priority support & updates

Admin Panel Features

User Management

Two ways to add users:

  • Email invite: enter an email address. The user receives an invite link and sets their own password.
  • Username account: leave email empty, enter a username and temporary password. Give the credentials to the worker. On first login they set a new password and a 4-6 digit PIN.

To use username accounts, first set an Org Login ID in Admin > Organization settings. Workers log in with: Org Login ID + Username + Password.

Other actions:

  • Change user roles (Admin, PowerUser, User)
  • Assign users to groups
  • Reset Password: for username users sets a new temp password; for email users resends the invite
  • Deactivate a user who leaves: they can no longer sign in, and everything they created keeps their name. Turn on Show deactivated to see them and Reactivate them at any time. You cannot deactivate your own account.
  • Deactivated users do not count toward your plan's user limit and are not offered as inspector, operator or recipient anywhere.
  • User Details: track skills and certificates per user (see User Details).

Access: choose who uses each page

In Admin > Access, decide for each row who can use it:

  • By role: tick PowerUser and/or User. Admins always have access.
  • By groups: add groups or individual people. Only Admins plus the people listed have access.

A Changed badge marks rows that differ from the default. Reset to Default returns a row to today's usual rule.

Rows: CRM customers; Invoices, quotes and shipments; Add a customer from a project; Prices and $ totals; Inventory; Project Search; Edit projects, parts and batches.

When a group is used By groups, only Admins can change its members. The Admin page and the Access tab are always Admin only.

Account owner

Each company has one owner: the person who created it. The owner is shown with an Owner badge.

  • Nobody can remove, deactivate or demote the owner, the owner included.
  • To step down, the owner uses Make owner on another Admin.
  • If the owner cannot be reached, contact QA Report support.

Group Management

  • Create and name groups
  • Add/remove members
  • Groups affect PowerUser visibility

Measurement Types Management

  • Add custom measurement types
  • Edit existing types
  • Set display order
  • Configure SVG icons

Measurement Tools Management

  • Add measurement tools (Caliper, CMM, etc.)
  • Upload tool icons
  • Set tool availability
  • Precision per tool: an optional number of decimals (0 to 6) next to each active tool. Auto-corrected values on reports are rounded to the tool's precision when it is set, otherwise to the precision selected in the report toolbar. Leave it blank to use the toolbar setting. It only affects values generated by the OOT correction, never values typed by hand.

PDF Settings

  • Upload banner/logo image
  • Set header background color
  • Set header font color
  • Toggle signature display

Display Settings

  • Configure OOT (Out of Tolerance) highlighting color
  • Set correction range for batch updates
  • Configure bonus tolerance settings

Report Fields Settings

  • Add/remove custom fields
  • Configure field data types
  • Set mandatory fields
  • Configure autofill options
  • Set field order
  • Configure PDF visibility

Auto Increment field type: choose Auto Increment as the type and set a Base (prefix), a Separator and a Start number (e.g. RPT, -, 001). Every new report gets the next serial automatically (RPT-001, RPT-002, ...). The value is generated when the Create Report dialog opens, checked again when the report is saved, and is read-only afterwards. Duplicated reports and reports made from a template also get a fresh serial. The number of digits follows the start number, so 001 gives three digits.

Reset toggles to defaults: puts the Required, New Report and PDF toggles back to the new-organization defaults (Required on Inspector only; New Report on Customer, DRW NO and Inspector; PDF back to default for standard fields, custom fields keep theirs). No field is added or removed. You confirm first, and nothing is saved until you click Save Configuration.

Machine file settings on the same page: Dimension Identifiers and Comment Section (see Machine File Upload and CMM Data Import).

Finding Your Way in the Admin Panel

Open it from the dashboard: Admin Tools > Admin Panel (Admin only). The sidebar groups the settings:

  • Organization: Org & Users & Groups, Billing
  • Reports: Report Fields Settings, Tolerance Tables, PDF Settings, Display Settings
  • Measurements: Measurement Tools, Measurement Types
  • Manufacturing: process steps, project and part fields, Route Card template, rejection reasons

Tolerance Tables

Set up general tolerance tables that reports can use to fill tolerances the drawing leaves blank (Admin Panel > Reports > Tolerance Tables, Admin only).

Two kinds of table:

  • By nominal range (Add ISO 2768-1 or Add empty table): rows are nominal ranges, columns are classes you name (for example Fine, Medium, Coarse), each cell is one +/- value. Ranges include both ends and are checked top to bottom, so a nominal of exactly 3 belongs to the 0.5-3 row, as in ISO 2768.
  • By decimal places (Add decimal place tolerances): the row is picked by how many decimals the nominal is written with. 12 has 0 places, 12.05 and 12.50 have 2. The report's display precision does not change this. Typical for "unless otherwise specified" blocks (X.XX = +/-0.01).

Each table has a Table name and a Unit (mm or inch); a report only offers tables in its own unit. Leave a cell empty to give that row no tolerance. Use Duplicate to copy a table and Save changes when done.

Deleting a table does not change reports that already used it: they keep their tolerances but no new ones are applied.

User Details (Skills and Certificates)

Track extra information about each user, such as certificates or training. Open it with the User Details button on the Org & Users & Groups page (Admin only).

  • Add Column (the + in the table header): give it a name (for example ISO 9001) and a type: Text, Number, Date or Checkbox.
  • Click a cell to set its Value and attach Documents.
  • Column headers can be renamed, moved left or right, or deleted. Deleting a column removes its data and documents for all users.
  • Click a user row (Show user details) to see Profile Details and add your own profile fields.

Keyboard Shortcuts

Report Page Shortcuts

  • Tab: Move between input fields
  • Enter: Save and move to next field
  • Escape: Cancel editing

Canvas Page Shortcuts

  • Scroll: Zoom in/out
  • Click + Drag: Pan the drawing
  • Click: Place balloon

Wizard Mode Shortcuts

  • Arrow Up/Down: Navigate dimensions
  • Enter: Save measurement
  • Tab: Move between fields

Contact & Support

Getting Help

For additional help:

  • Contact Support: the button at the bottom of this Help page opens the contact form
  • Report a problem: from the Help menu on the dashboard (see Report a Problem)
  • Email: info@qa-report.com
  • Documentation: search this Help page

Report a Problem

Tell our team about something that went wrong, right from the app:

  1. Open Help > Report a problem in the dashboard header (on other pages, use your account menu).
  2. Describe What happened?. Optionally choose Where did it happen?, When?, What were you doing?, How bad is it? and How often?.
  3. Optional: add a Screenshot (paste with Ctrl+V, drop or click). Check it shows nothing confidential.
  4. Optional, when you are on a report: tick Share report ... with our team. This turns on a share link for 7 days; you can stop it any time in Share.
  5. Click Send report.

The page, recent errors, loading times and your last clicks are attached automatically. Your drawings and measured values are never included.

Inventory Control

What is Inventory Control?

Inventory Control tracks the raw material your shop buys, holds and consumes, and links it to the parts you make.

It covers four things:

  • Material Catalog - every item you stock, its size, where it lives and how much is left
  • Suppliers - who you buy from
  • Orders - purchase orders from draft through to receiving
  • Settings - material types and your company details for printed POs

The central idea: when you take material for a part, it comes off your stock immediately. What the part does not hand back is what it used. There is no separate "consume" step to remember.

Who can use it

Inventory Control is available to the Admin and PowerUser roles.

Users with the User role do not see it and cannot take or return material. Opening the page address directly sends them back to the Dashboard.

To open it, click Admin Tools in the Dashboard header, then Inventory Control. Inside, the left sidebar switches between Materials, Suppliers, Orders and Settings.

Adding a material to the catalog

Click Add Material on the Material Catalog page.

  • Code (required) - your own reference, unique in your organization, e.g. SS-304
  • Name (required) - a readable description, e.g. "Stainless Steel 304"
  • Stock Format (required) - how the material is physically held and counted (see below)
  • Material Type (required) - the family it belongs to, e.g. SS or Aluminum. Pick from the list, or add a new one with the + button
  • Unit of Measure - the unit the dimensions are in: mm, m, in or ft
  • Location - where it is stored, e.g. "Shelf A3". This is a label, not an enforced warehouse system
  • Description - optional notes

Stock formats and their dimensions:

  • Pieces - counted units. Size is optional: Length, Width, Height, Diameter and a unit. Fill in only what applies
  • Rod (D x L) - diameter and length, both required
  • Bar (W x H x L) - width, height and length, all required
  • Sheet (W x L x T) - width, length and thickness, all required

The format decides what a stock quantity means. A rod's stock is a count of rods, not millimetres - the dimensions describe how big one rod is.

A new material starts with no stock. Stock arrives when you receive a purchase order, or with Adjust Stock.

Stock Format, Material Type and the dimensions cannot be changed after the material is created.

Understanding stock numbers

The catalog shows for each material:

  • Available - what you can take right now
  • On Order - quantity on purchase orders that has not arrived yet. Draft orders count too; cancelled and fully received lines do not
  • Last Activity - the date of the latest stock movement or purchase order. The catalog opens sorted by this, newest first

Available goes down when you take material for a part, and up when material is received from a purchase order or handed back.

A row turns red when its Available is at or below the material's low-stock alert threshold.

There is no "allocated" figure. Material taken for a part has genuinely left the shelf, so it is not counted as available. To see where it went, open the material and look at Held by parts, which names each part and how much it is holding. Click a part to open it.

Taking material for a part

Material is taken from the part, not from the catalog.

  1. Open a project and Add Part, or open an existing part and click Edit
  2. Go to the Materials Required tab
  3. Filter by Material Type or search by code or name
  4. Type a quantity into the Take column for each item you want
  5. Save

You can take from several materials at once - fill in the Take column on as many rows as you need. The footer at the bottom of the dialog shows what will be taken, on every tab, so you can check it without switching back.

On an existing part, the tab also shows Currently held - how much was issued, how much came back, and what the part still holds.

If you ask for more than is available the save is refused and nothing is taken. Either the whole basket succeeds or none of it does.

Pieces and the part's Stock Qty: pcs taken from a Pieces material are added to the part's Stock Qty. This works one way only: returning material does not lower Stock Qty, and you can still edit Stock Qty by hand.

When you save, a warning can appear:

  • Stock is below the required quantity - Stock Qty is less than Required Qty
  • No extra stock - Stock Qty equals Required Qty, so there is no buffer for rejects

Click Save anyway to continue, or Go back to change it. The save is not blocked.

Offcuts (Remains)

When you cut a 3000 mm rod down and have 1800 mm left over, that leftover becomes its own row in the catalog.

  • It is coded after its parent: an offcut of ss-304 becomes **ss-304_1**, then ss-304_2, and so on
  • It inherits the parent's name, material type, format and location - only the size differs
  • It is marked with a REMAIN badge so you can tell it from full-size stock
  • It can be taken for another part exactly like any other material

Offcuts look after themselves:

  • Take an offcut and it disappears from the catalog - it is on the job now
  • Hand it back untouched and it comes back
  • Cut it down further and you get a new offcut, numbered from the original parent - so an offcut of ss-304_1 is ss-304_3, not ss-304_1_1

Numbers are never reused. Each one refers to one specific physical piece, permanently.

Returning material to inventory

Open the part and click Return to Inventory in the Material Information panel.

For each item the part is holding you decide:

  • Whole pieces back to stock - complete, uncut pieces going back on the shelf
  • Add offcut - a cut-down piece. Enter its new size; the dialog shows the code it creates before you commit

Only the dimension a cut can actually change is editable. A rod or bar gets shorter but keeps its other sizes. A sheet loses width and length but keeps its thickness. Pieces cannot be cut at all. An offcut must be smaller than the piece it was cut from.

Anything you do not hand back simply stays with the part - the dialog shows how much stays. It is not written off and not marked used. You can hold material for weeks and return it in stages. Whatever the part still holds when the job ends is what it consumed - you never have to declare that.

Finding things in the catalog

Under the column headers is a filter row:

  • Type in Code, Name or Location to narrow the list
  • Pick from Material Type and Stock Format
  • Turn on Show archived to include materials you archived

Click a column header to sort by it; click again to reverse.

Offcuts on the rack are listed with a REMAIN badge next to their code. An offcut that has been used up is not listed at all, not even with Show archived on - it is on a job. To find it, open the material it was cut from and look at Held by parts, or open the part.

If nothing matches, click Clear filters.

Suppliers

Open Suppliers in the left sidebar. Click Add Supplier to add one. Only Name is required; you can also store a code, contact, email, phone, address, country, website, payment terms, tax ID, currency and notes.

Click a row to open it in the panel below the table. On the Detail tab, click any field to edit it in place. The Orders tab lists its purchase orders, and New Order starts an order for this supplier.

A supplier that has never been ordered from can be deleted. One that appears on any purchase order, even a cancelled one, can only be archived. Archiving hides it from the supplier list and keeps its orders intact; Restore brings it back.

The Status filter in the table shows Active suppliers by default. Switch it to Archived or All to see archived ones.

Creating a purchase order

On the Orders page click New Order. You can also click New Order inside a material or supplier panel, which fills that material or supplier in for you.

  1. Pick the Supplier
  2. The PO Number is generated for you. You can change it, but it must be unique
  3. Set an Expected Date and any Notes
  4. Click Add Line for each item - each line needs a material, a quantity and a unit cost
  5. Optionally upload the supplier quote and attach other documents
  6. Click Save as Draft, or Issue PO straight away

While an order is a Draft or Issued and nothing has been received, you can change its lines: open it and click Edit Lines. A save bar appears when something changed. Expected Date and Notes can be changed until the order is cancelled.

Issuing sets the order date and saves a PDF of the order to its documents. On a draft, Preview PDF shows the order with (DRAFT) in the title so it cannot be mistaken for a real order.

Orders whose Expected Date has passed and that are not yet received are shown in red in the table.

To stop an order, click Cancel Order. Quantities already received stay in stock.

Receiving an order

Open the order and click Receive Purchase Order on a line.

Enter the Quantity to Receive - it does not have to be the full amount, but it cannot be more than what is still remaining. Click Confirm Receipt. Stock for that material goes up immediately, and the line records what is still outstanding.

The order status follows along by itself:

  • Issued - nothing received yet
  • Partially Received - some lines or some quantities have arrived
  • Received - everything has arrived

You can only receive against an Issued or Partially Received order. A draft must be issued first.

Once anything has been received the order's lines can no longer be edited, and the supplier quote can no longer be replaced. This is deliberate: the order has to keep matching what was actually delivered.

Documents on an order

An order's Documents list can hold:

  • Supplier Quote - upload it when creating the order, or later with Attach Quote (PDF, Word, JPG or PNG). Replace Quote works until something is received
  • Issued PO - the PDF saved when you issued the order
  • PO versions - every PDF made with Generate New PO Version
  • Other documents - delivery notes, certificates, correspondence. Attach as many as you like with Attach Document

Supporting documents can be attached at any stage, including after the order is fully received or cancelled - which is usually exactly when the delivery note or certificate turns up.

Click any document to open it. To remove an attached document, click its bin icon and confirm. The file is deleted permanently.

The Orders table also has Quote and PO columns, so you can open those files without opening the order.

Minimum stock alerts

There are two different low-stock alerts. They are easy to confuse, so be clear which one you want.

Material stock alert - set in the Minimum Stock Alert box on a material's Detail tab in Inventory Control. Turn it on, enter a Threshold and choose Recipients. It warns when the *available raw stock* of that material is at or below the threshold, so you know to re-order. Quantity only. Changes save as you make them.

Part stock alert - set on the Minimum Stock Alert tab of the Add or Edit Part dialog. Warns when the *finished stock* of that part falls below a buffer against its required quantity. Supports Quantity or Percent, and shows the resulting piece count as you type.

Both send an alert sticker note to the users and groups you choose. A material alert is sent once when stock drops to the threshold, and again only after stock has gone back above it and dropped again.

The movements log

Every change to stock is recorded. Open a material and go to the Movements tab to see its history, 20 rows per page. Each row shows the date, type, the part and project it went to or came from, the quantity and any notes.

  • Receive - arrived from a purchase order
  • Issue - taken for a part
  • Return - handed back from a part, or a new offcut created
  • Adjust In / Adjust Out - a manual correction, which always requires a reason

The log is permanent. Entries cannot be edited or deleted by anyone, which is what makes it usable as an audit trail. If something is wrong, correct it with an adjustment - the mistake and the correction both stay visible.

To correct stock, click Adjust Stock in the material panel, choose Add Stock or Remove Stock, enter the Quantity and a Reason. The dialog shows the stock after the change. You cannot remove more than is available.

Use Adjust Stock for genuine physical corrections - scrap, a miscount, a write-off. Do not use it to hand material back from a part; use Return to Inventory, so the ledger keeps the two apart.

Common questions

"This part still holds material" when deleting a part

The part has not returned everything it took. Deleting it would remove that stock from the catalog with no record of where it went. Use Return material in the message to go to the part, hand the material back, then delete it.

A material cannot be deleted

A material that has ever been used - in a movement, on a purchase order, by a part, or as the parent of an offcut - cannot be deleted, because doing so would break that history. Archive it instead: it disappears from the catalog and cannot be taken for parts, and the history stays intact.

"Insufficient stock" when taking material

Another part may have taken it, or it was never received. Check Available on the material, and On Order to see if a delivery is outstanding.

An offcut vanished from the catalog

It was taken for a part. Used-up offcuts are not listed, even with Show archived on. Open the material it was cut from and look at Held by parts.

Stock looks wrong

Open the material's Movements tab. Every change is listed with its date, type, part and project, quantity and notes.

I archived a material by mistake

Turn on Show archived, open the material and click Restore.

Viewing and editing a material

Click a material in the catalog. Its panel opens below the table.

The top bar shows the code, name, status, Stock and On Order, plus the buttons Archive, Delete and Adjust Stock.

The panel has three tabs:

  • Detail - the material's attributes, Held by parts and the Minimum Stock Alert
  • Orders - purchase orders that include this material, with New Order to order more
  • Movements - every stock change for this material

On the Detail tab, click Name, Location or Description to edit it in place. The change saves by itself.

Material Type, Stock Format and dimensions cannot be changed. They describe the physical stock, and changing them would change what every past movement and order referred to. If they are wrong, archive the material and add a new one.

Archive, restore or delete a material

Open the material and use the buttons in the panel's top bar.

  • Delete - removes the material permanently. Only possible while it has never been used: no movement, no purchase order line and no part has ever referred to it. Otherwise the button is greyed out
  • Archive - hides the material from the catalog. It cannot be taken for parts or picked on new orders, and its history is kept
  • Restore - shown on an archived material. Puts it back in the catalog

To see archived materials, turn on Show archived in the catalog's filter row.

If a delete is refused, a message lists what still refers to the material (movements, orders, parts) and offers Archive instead.

Offcuts have no Archive button. They leave the catalog by themselves when they are used up, and come back if returned.

PO PDF versions

Once an order has been issued, the PDF saved at that moment is kept as the record of what your supplier received. It is never overwritten.

If something changes later - your company details, the supplier's details, or the order's lines before anything is received - click Generate New PO Version in the order panel.

  • A new PDF is built from the current data
  • It is numbered: the first one is v2, then v3, and so on. The version number is printed next to the PO number in the PDF
  • It is saved to the order's Documents and opens so you can check it or send it

On a Draft order the button is Preview PDF instead. It only shows the PDF, marked (DRAFT), and saves nothing.

Inventory settings

Open Settings in the Inventory Control sidebar.

Company Profile - the Address and Phone printed on your purchase orders. Click Save after changing them. The company name and banner image on the PO come from your organization settings.

Material Types - the list offered when you add a material. Type a name and click + to add one, or click the x on a type to remove it from the list. Removing a type does not change materials that already use it.

You can also add a material type while adding a material, with the + next to Material Type.

Working with the tables and panels

Materials, Suppliers and Orders all work the same way: a table on top, and a details panel below it.

  • Click a row to open its panel. Drag the line between table and panel to resize it
  • Click the collapse button at the right of the panel's top bar to close it. If the panel is hidden, Show details in the page header brings it back
  • Each mode keeps its own selection, so you can switch between Materials, Suppliers and Orders without losing your place

The Orders table has a filter row too: type a PO Number, pick a Supplier or a Status, and filter the Date, Expected and Received columns by Range, Before or After. Click a column header to sort.

If you edited an order and click another one without saving, you are asked whether to Discard your changes.

Hover help on fields

In Inventory Control, labels with a dotted underline have a short explanation. Hover over the label to read it - for example Available, On Order, Last Activity, Stock Format or Archive.

The explanations are one line each. For anything longer, use this Help page.

Platform Architecture & Security

Our Technology Foundation

QA-Report is built on a modern, secure and scalable architecture:

  • Database: Supabase, a SOC 2 Type II certified data platform (independently audited for security, availability and confidentiality), trusted by organizations like Mozilla, Johnson & Johnson and 1Password
  • Hosting: Amazon Web Services (AWS), hosted in the EU (Frankfurt), compliant with ISO 27001, SOC and GDPR standards
  • Application: React, Node.js and PostgreSQL - the modern JavaScript ecosystem for speed and reliability

Learn more on the Technology & Security page at qa-report.com/technology

How Your Data Is Protected

  • Encryption: all data is encrypted in transmission and at rest
  • Access control: role-based permissions - operators, inspectors and admins each see only what their role allows
  • Private file storage: drawings and documents live in private storage, accessible only through expiring signed links
  • Customer aliases: end-customer names can be hidden from floor staff for confidential programs
  • EU hosting: all data resides in the EU (Frankfurt) under GDPR

On-Premise Data Option

For high-confidentiality industries such as aviation, military and defense, QA-Report offers an on-premise option: your sensitive data stays inside your own facility while your team keeps full web access on any PC across your facility network - no installs, no license limits.

On special request, the platform can be customized for full on-premises data deployment, tailored to your security requirements. Contact us at info@qa-report.com to discuss your needs.

QA Report QA Report

Enterprise-grade quality assurance reporting platform engineered for precision manufacturing and mechanical operations. Trusted by industry leaders worldwide.

info@qa-report.com

Solutions

  • CMM Integration
  • GD&T Compliance
  • Statistical Analysis
  • Enterprise Reporting
  • Quality Management
  • Regulatory Compliance

Industries

  • Aerospace & Defense
  • Automotive Manufacturing
  • Medical Device
  • Precision Machining
  • Tool & Die Making
  • Heavy Manufacturing

Support

  • Enterprise Support
  • Technical Documentation
  • Training Programs
  • System Status
  • Security Center
  • Professional Services
  • Technology & Security
Contact Us
© 2026 QA Report. All rights reserved. Powered by protocem.com Privacy Policy · Terms of Service