Projects
What are Projects?
A project is one manufacturing order or job. It holds the parts you make, their process steps and batches, the production schedule, project documents and team notes.
- Track progress of every part and batch through each operation
- Plan with the production schedule
- Print Route Cards that travel with each batch
- Link inspection reports to the steps where they are made
- See status of all projects on the Projects board
See the Manufacturing (MES) section for the full guide.
Creating a Project
To create a new project:
- On the Dashboard, switch the view to Projects
- Click + New Project
- Fill in the project fields your organization uses, for example Project Number, Name (required), Customer, Order No., Priority, Planned Start, Planned End, Project Lead and Description
- Click Create Project
The new manufacturing project opens so you can add parts. It starts in the To Do column of the Projects Board.
If Quotations are turned on, Admins also see Create a quote in the dialog. Tick it to write a quote instead, without creating a project. You can convert the quote to an order later.
Switching Between Reports and Projects View
The Dashboard has a toggle above the board:
- Reports: report cards on the report workflow board
- Projects: the Projects board with your manufacturing projects
In Projects view the cards above the board change too: + New Project and, for Admin and PowerUser, Search Projects. Your last choice is remembered.
If there is no Projects tab, manufacturing is not included in your organization's plan.
Project Kanban Board
The Projects Board shows your projects by status:
- Four columns: To Do, In Progress, For Review, Done
- Drag and drop: Admin and PowerUser can move project cards between columns to change the status
- Project cards show the project name and fields, steps progress and finished reports
- Done column: shows projects finished in the last 2 weeks. Older ones are counted at the bottom of the column. Projects that have parts can still be found in Project Search.
- Projects In Quotation or Archived are not on the board
Admins also see each project's Order Value and column totals (see Order Value and Hiding Amounts).
Click any project card to open the project.
Linking Reports to a Project
Reports are linked to manufacturing projects through their steps:
- In a step's Report field, pick an existing report or create one for the step (see Step Details and Recording Work on a Step)
- A report created from a step belongs to that project and gets the part's drawing file attached
- On the Reports board, such a report's card shows Project / Part; click it to open the part
To label reports freely without a project, use Report Groups (see Report Status & Kanban).
Older projects created before manufacturing projects were introduced still use Add Report in their details window.
Auto-Group Rules (Older Projects)
Auto-group rules exist only on older projects created before manufacturing projects were introduced. Open such a project, and under Grouping Rules click Run Now to assign matching reports by customer, order number or drawing number.
Manufacturing projects link reports through their steps instead.
Project Detail View
Clicking a project card opens the project page with its parts, documents, notes, schedule and summaries. See The Project Page in the Manufacturing (MES) section.
Older projects created before manufacturing projects were introduced open a smaller details window instead, with project info, grouping rules, the list of reports and documents.
Project and Part Documents
Attach files where they belong:
- Project Documents (project page, left panel): POs, specs, work instructions for the whole order
- Part Documents (part page, left panel): files for one part
Drag files onto the section or click +. Click a file to open it, or use its buttons to download or delete it.
Everyone who can see the project can open its documents. Those who can edit the project or part can add and delete them. Documents are separate from report attachments and never print on the Route Card.
Internal Notes
Every manufacturing project has an Internal Notes section at the bottom of the left panel, under Project Documents.
- Click the header to expand it and type. Notes save by themselves a second after you stop typing; Saved appears when done.
- The section remembers whether you left it open, and a small dot on the collapsed header shows that notes exist.
- Anyone who can edit the project can write notes; others see them read-only.
- Notes are for your team only. They never appear on the Route Card or any customer-facing document.
Adding a Part: Drawing Number Suggestions
When you add a part to a project and type its Drawing Number, a list of matches appears after two characters:
- Existing parts from any project in your organization, with the part and project name
- Reports with that drawing number, with part name, revision and date
Pick a match with the mouse or the arrow keys and Enter. Typing an exact match and leaving the field counts as a pick.
- Part match: choose Use as template to copy the part's name, revision, material, notes, custom fields, process flow (route steps) and its drawing file and image, or Fill fields only to copy just the fields. Part number, quantities, stock, dates and material allocation are never copied.
- Report match: choose Pull details from report to fill part name and revision and copy the report's drawing file and part image.
Copied files become the new part's own files, so later changes or deletion of the source do not affect it. Filled fields flash briefly, and a copied drawing shows its name in the upload slot where you can still replace it.
Finding Projects and Reports
Ways to find projects and the reports in them:
- Project Search: Admin and PowerUser can search all parts across projects, filter by project status and change the status of many projects at once (see Project Search: Status and Bulk Status Change)
- Report Search: the search table includes a Project column to filter reports by project
- Projects Board: browse active projects by status
- Report Cards: report cards on the kanban show which project they belong to
Unassigned reports (not in any project) can be found by filtering for an empty project field in Report Search.
Project Statuses: In Quotation and Archived
Besides the four board statuses (To Do, In Progress, For Review, Done), a project can be:
- In Quotation: not ordered yet
- Archived: kept for reference, out of the way
These projects do not appear on the Projects Board. To find them, open Project Search and pick the status in the Status filter (archived projects show only when you filter for Archived). Project Search lists projects through their parts, so a project with no parts does not appear there.
Allowed moves:
- Only a To Do project can be moved to In Quotation, and it leaves In Quotation only back to To Do.
- Any project can be archived. An archived project can return to To Do or In Quotation.
For Admins, a project in quotation lists its quotes in the left panel; click one to open it in the CRM. Reports created from such a project start in To Do.
Project Search: Status and Bulk Status Change
On the Dashboard in Projects view, click Search Projects (Admin and PowerUser). The table lists every part with its project's fields.
- Status is the first column. Filter it to one status, or keep All.
- When your organization uses quotations or has archived projects, the status filter also offers In Quotation and Archived, and All (except archived) hides archived projects.
To change the status of several projects at once:
- Tick the checkbox on a row. All rows of that project are selected. The header checkbox selects every project on the page.
- In the bar above the table, click the new status
- Projects where that move is not allowed are skipped, and a message tells you how many
The selection clears when you change page, filter or sort.
Order Value and Hiding Amounts
Admins can record what each project is worth.
- Open the project
- In the left panel, under Order Value, type the amount and pick the currency
- Press Enter or click elsewhere to save. Empty the box to remove the value.
On the Projects Board:
- Each card shows its Order Value
- Each column header shows a Total per currency. Hover it to see how many projects have a value.
Order Values are visible to Admins only.
Hide amounts: when Order Values are shown, the button above the board switches between Hide amounts and Show amounts. Hidden amounts show the currency but no digits, which is useful on a shared screen. The choice is remembered on this browser.
Invoices and Quotes on the Project Page
For Admins, the project page left panel shows the commercial side of the order:
- Create invoice: starts an invoice from the project's parts (see CRM: Creating an Invoice)
- Invoices: each invoice of the project with its status and the amount still due. Click one to open it in the CRM.
- Quotes: for a project in quotation, its quotes with total and valid-until date
Other roles do not see these sections.
Manufacturing (MES): Parts, Batches, Route Cards
Manufacturing (MES) at a Glance
QA Report's manufacturing module tracks an order from the first operation to the last, on the shop floor.
How it is organized:
- Project: one customer order or job
- Parts: the items the project makes, each with its drawing file, image, quantities and documents
- Process Flow: the ordered list of steps (operations) a part goes through, for example Material Order, CNC Milling, Inspection
- Batches: groups of pieces that move through the steps together. Each batch shows its progress on every step.
- Route Card: the printed form that travels with a batch
Where to find it: on the Dashboard, switch the board from Reports to Projects. Click a project card to open the project, then click a part to open the part page.
If you do not see the Projects tab, manufacturing is not included in your organization's plan. Contact support to enable it.
Who Can Do What in Manufacturing
What you see and can change depends on your role and your groups.
Admin
- Sees every project
- Can do everything below, plus split, merge and delete batches, see Cost Estimation and Order Value, and change the manufacturing settings in the Admin panel
PowerUser
- Sees projects whose Project Lead shares at least one group with them
- Can create and edit projects, parts, batches and steps, and sees the production schedule
- Can fill any step, edit or delete completion entries, pass a partial step through and recover rejected parts
User (operator)
- Sees only projects where at least one step is assigned to one of their groups
- Can fill in only the steps assigned to their groups. Steps with no group assigned are closed to them.
- Cannot create or change projects, parts, batches or steps, and does not see the schedule
Project Lead: the Project Lead can also add, edit and delete that project's parts, documents and notes, and split, merge and delete its batches. A Project Lead with the User role sees the project only if one of its steps is assigned to their group, and cannot change Project Details.
Groups are managed in Admin Panel > Org & Users & Groups.
Creating a Manufacturing Project
- On the Dashboard, switch to Projects
- Click + New Project
- Fill in the fields. By default these are Project Number, Name, Customer, Order No., Priority, Planned Start, Planned End, Project Lead and Description. Name, Order No. and Project Lead are required.
- Click Create Project
The Project Lead matters: PowerUsers in the lead's groups can see the project, and the lead can manage its parts and batches.
Admins can rename, reorder, hide or add project fields in Admin Panel > Manufacturing > Project Fields. The Card option there chooses which fields show on the project card.
Admin and PowerUser can create projects.
The Project Page
Click a project card on the Projects board to open it.
Left panel
- Project Details (Admin and PowerUser): the project fields. Click the pencil to edit.
- Project Parts: every part with its image and name. Click a part to open it. The ... menu edits or deletes a part. A part marked Needs details still needs its part number, drawing or material.
- Project Documents: drag files here or click + to attach POs, specs or work instructions
- Internal Notes: notes for your team only
Main area
- Production Schedule: a timeline of the parts (see Production Schedule)
- Production Summary, Parts Overview and Quality Summary: pieces per step, progress per part, and passed versus rejected pieces
Admins also see the project's Order Value in the left panel.
Adding a Part
On the project page, click + next to Project Parts (or Add Part). The dialog has three tabs.
Part Details
- Fill in the part fields, for example Name, Part Number, Drawing Number, Revision, Material, Quantity Required, Stock Qty, Planned Start, Planned End and Notes. Required fields are marked.
- Part Number is required unless it is an Auto Increment field.
- Upload the part's drawing file. It is required, and it is attached automatically to reports you create from the part's steps. A drawing image (JPG, PNG) can be up to 5 MB; for a larger drawing use a PDF.
- Part Image: click the box, drag an image onto it, or press Ctrl+V to paste a screenshot. JPG, PNG, GIF or WebP, up to 5 MB.
- A field marked AUTO fills itself in when the part is saved.
- Typing a Drawing Number suggests existing parts and reports (see Adding a Part: Drawing Number Suggestions)
Materials Required: take material for the part from Inventory Control
Minimum Stock Alert: get warned when the part's finished stock runs low
Click Add Part to save. Admin and PowerUser can add parts. Admins choose which part fields exist in Admin Panel > Manufacturing > Part Fields.
The Part Page
Click a part on the project page to open it.
Left panel
- Part Image: click it to change it, or press Ctrl+V anywhere on the page to paste a new image. Pasting replaces the current image.
- Part details and Required Quantity
- Stock Material bar: how much extra stock you have against the required quantity (see Stock Qty)
- Batches: every batch with its quantity. Click a batch to edit it, or Add Batch.
- Part Documents: files for this part only
- Cost Estimation (Admin only)
Main area
- Schedule: the batch timeline. It starts hidden; click Show Schedule in its header to open it.
- Process Flow: a table with one row per batch and one column per step. Each cell shows that batch's status on that step.
Click the pencil next to Part Details to edit the part (Admin and PowerUser).
Building the Process Flow
The process flow is the list of steps for one part.
- On the part page, click Add Step in the Process Flow header
- Click a step from your organization's step library. It is added at the end with its fields, statuses and default assignment.
- Repeat for each operation
Each step column header has a menu with Step Details (change the step for this part only) and Delete Step. Drag a column to change the order. A step that already has completion data cannot be moved.
A colored bar under the step name shows its ETA, and small icons show who it is assigned to.
If the library is empty, ask an Admin to add steps in Admin Panel > Manufacturing > Process Steps.
Admin and PowerUser can change the process flow.
Step Details: Assignment, Fields and Report
Open a step column's menu and choose Step Details. Changes apply to this part only; the library stays as it is.
- Name, Color, Description
- Cost and ETA: override the library cost for this part. A per-hour cost needs an ETA.
- Assign Operators and Assign Groups: Users with the User role can only fill steps assigned to one of their groups. The Operator list when filling the step is limited to the assigned operators and group members.
- Fields: the data collected at this step. Types: Text, Number, Date, Checkbox, Select, URL, File, Report. Tick Req to make a field required.
- Statuses: each status has a type: Initial, In Progress or Completed
Picking a Report for a step: on a Report field, search for an existing inspection report or create a new one. It is preselected for every batch of this part. The operator can still change it, and steps already filled keep their own report.
When you pick a report you can Attach as-is or Use as template (a new empty report is created from it). Create report for this step starts a new report with the part's drawing file already attached.
Creating and Managing Batches
A batch is a group of pieces that goes through the steps together.
Add a batch
- On the part page, click Add Batch
- The batch name is filled in for you from your organization's naming pattern. You can change it.
- Quantity starts at what is still unallocated. The dialog shows Total required, Allocated and Remaining. If Stock Qty is higher than the required quantity, you can allocate up to the stock.
- Set Planned Start and Planned End, then click Add Batch
In the Process Flow table
- The ... menu next to a batch name offers Print Route Card, Split Batch, Merge Batch and Delete Batch
- Sort batches By Name, By Quantity or By Date
- Hide Done is on by default: batches whose steps are all completed are hidden. Click Show Done to see them.
- Rejected pieces show in brackets after the batch quantity
Deleting a batch returns its quantity to unallocated. Admin and PowerUser can add batches. Split, merge and delete are for Admins and the project's Project Lead.
Recording Work on a Step
Click a cell in the Process Flow table to record work on that step for that batch.
- Choose the Status
- Fill in the step's fields
- Under Completion Entries, choose the Operator, enter Comp (completed) and Rej (rejected) quantities and the Date, then click Add. Typing a rejected quantity fills in the completed quantity for you.
- Add more entries as work continues. Remaining shows what is left.
- Click Save
Good to know:
- Each step receives the pieces completed at the step before it. You cannot enter more than remain.
- If the operator has a PIN, they confirm the save with their PIN or password (3 attempts).
- Setting a Completed status with pieces still remaining: a User's remaining pieces are recorded as completed; Admin and PowerUser are asked about partial completion.
- Admin and PowerUser can edit or delete entries. An entry cannot be changed while a later step already has entries; clear the later step first.
- Deleting all entries resets the step.
Hover a cell to see who submitted it and when.
Rejected Pieces and Rejection Reasons
When a completion entry has a rejected quantity, a Select Rejection Reason window opens. Pick a category, then a reason in it. Closing the window without a reason discards that entry.
Where rejections show up:
- In the step's entries and in brackets after the batch quantity
- In the Quality Summary on the project page
- On the Route Card, with the reason in the Notes column
Reasons stay with the pieces when a batch is split or merged.
Admins set up the categories and reasons in Admin Panel > Manufacturing > Rejection Reasons. Every organization starts with a ready-made list. If all categories are removed, no reason is asked for.
Recovering Rejected Pieces
A rejected piece that is reworked or found acceptable can go back into the process.
- Open the step where the pieces were rejected
- In Completion Entries, click the rejected quantity of the entry
- In Recover rejected parts, enter the Quantity, choose a Reason and add an optional Note, then click Add
The recovered pieces count as available again, and the step reopens so they can be completed. The cell shows a small recovery marker.
Admin and PowerUser can recover pieces. Admins set the recovery reasons in Admin Panel > Manufacturing > Rejection Reasons, under Recovery Reasons. Tick Print recovered quantities on Route Card to show them on printed Route Cards.
Partial Completion (Sample Inspection)
Sometimes you check only a few pieces and pass the whole batch, for example inspecting 3 out of 100.
When an Admin or PowerUser saves a step with a Completed status while pieces remain, a Partial Completion window asks: *Only 3 of 100 completed. Pass all 100 to the next step?*
- Yes, pass all through: the step is marked completed and all pieces, except the rejected ones, move to the next step
- Cancel: nothing is saved, so you can keep entering work
For Users, remaining pieces are recorded as completed automatically.
Splitting and Merging Batches
Split a batch
- In the Process Flow table, open the batch's ... menu and choose Split Batch
- Set Split into to the number of sub-batches
- Check the name and Quantity of each sub-batch. The Sum must match the original quantity exactly.
- Click Split
Progress already recorded is shared out between the sub-batches in proportion to their size, with whole numbers that always add up. Sub-batches appear indented under the original. A batch whose steps are all completed cannot be split.
Merge two batches
- Open the ... menu of one batch and choose Merge Batch
- Click the other batch in the table
- Check which batch is kept. Use Swap to change it. The dialog shows the Combined quantity.
- Click Confirm Merge
Both batches must be of the same part, and every step must have the same status in both. The batch that is merged in is permanently deleted.
Split and merge are available to Admins and the project's Project Lead.
Stock Qty, Inventory Pieces and Low Stock
Stock Qty on a part is how many pieces you have to work with. Anything above Quantity Required is your buffer against rejects.
- On the part page, the Stock Material bar shows the buffer: extra pcs, No buffer! or short!, and how many rejected pieces it has already used.
- When you take material in pieces from Inventory Control for a part, those whole pieces are added to the part's Stock Qty when you save. Returning material does not lower Stock Qty.
- If Stock Qty would end up below the required quantity, a warning lets you Go back or Save anyway and add stock later. If it equals the required quantity, you are told there is no buffer for rejects.
To be warned automatically when a part's finished stock runs low, use the Minimum Stock Alert tab in Add Part or Edit Part.
Printing Route Cards
A Route Card is the printed form that travels with a batch on the shop floor.
One batch: open the batch's ... menu in the Process Flow table and choose Print Route Card.
All batches: click Print All in the Process Flow header.
Then choose:
- Filled: with the batch data recorded so far
- Empty: a blank form to fill in by hand
The PDF opens in a new browser tab, where you can print or save it. The layout comes from your organization's Route Card template.
Internal Notes never appear on a Route Card.
Designing the Route Card Template (Admin)
Admins design the Route Card in Admin Panel > Manufacturing > Route Card Template.
- Page Header and Page Footer: turn on Logo, Org Name, Title, Page #, Print Date and Custom Text
- Choose Portrait or Landscape, and LTR or RTL for right-to-left languages
- Build the page from blocks: Header Banner, Info Grid, Barcode, Steps Table, Free Text, Separator, Signature Line and Part Image
- Drag fields from Available Fields (Project, Part, Batch, System) into a block
- Barcode: Code 128 or QR Code. Encode the batch number so it can be scanned in Batch Lookup.
- Steps Table: built-in columns (#, Operation, Performed By, Qty, Date, Notes) plus your Step Fields and Shared Fields. Add empty rows for handwritten entries.
Click Preview to see a sample PDF, then Save Template.
Which step fields can print is set with the RC tick box on each field in Process Steps.
Process Steps Library (Admin)
Admins define the steps every part can use in Admin Panel > Manufacturing > Process Steps.
For each step:
- Name, Color and Description
- Fields: the data operators fill in. Types: Text, Number, Date, Checkbox, Select, URL, File, Report. Each field has Req (required), a Default value and RC (print on the Route Card).
- Statuses: for example Queued, Running, Complete. Each one is Initial, In Progress or Completed.
- Cost & ETA: a cost Per Hour, Per Part or Per Step, with currency. The ETA is set per part.
- Default Assignment: users and groups assigned automatically when the step is added to a part
Shared Fields: fields added here appear in every step, for example Machine or Notes. In each step you can hide a shared field with the eye button or give it a default value.
Click Save. A step already on a part keeps its own settings for that part. New fields you add to a library step also appear in that step's Step Details on existing parts.
Part Fields and Batch Naming (Admin)
In Admin Panel > Manufacturing > Part Fields, Admins choose the fields on the Add Part and Edit Part forms.
- Rename, reorder, hide or make fields required. Core fields (with a lock) cannot be deleted.
- Add custom fields: Text, Number, Date, Select, Textarea, Auto Increment, Constructor
- Subtitle: show a field, such as the drawing number, under each part's name on the project page
- Wide: make a field take the full width of the form
Batch names: the Batch field uses the Constructor type. Build the pattern from pieces: part fields, free text, separators and an automatic counter. Example: Part Number + "-" + counter gives P-1001-1, P-1001-2 and so on. New batches get the next name automatically.
Auto Increment fields (for example a part number) fill in the next number when the part is saved.
Project fields work the same way in Project Fields.
Production Schedule (Gantt)
The schedule shows planned dates as bars on a timeline.
- On the project page it shows each part. On the part page it shows each batch and starts hidden; click Show Schedule in its header.
- Drag a bar to move it, or drag either end to change the start or end date. The new dates are saved.
- Use Zoom in, Zoom out and Fit all. The Today line marks the current date.
- Hide Schedule collapses it again.
The schedule is shown to Admin and PowerUser. Dates can be changed by those who can edit the project or part. It is not shown for projects in quotation or archived.
Batch Lookup and Shop-Floor Mode
Batch Lookup takes an operator straight to one batch, ideal for a shared tablet or PC with a barcode scanner.
- On the Dashboard, click Batch Lookup
- Scan the barcode on the Route Card, or type at least two characters of the batch number
- With one match, the batch opens automatically. Otherwise pick it from the list with the mouse or arrow keys and Enter.
The barcode may contain more than the batch number, for example order and batch joined by dashes. Batch Lookup finds the batch inside it.
The batch opens in shop-floor mode: only that batch's row in the Process Flow, with editing tools hidden. The operator clicks a step, records the work and saves, and the screen returns to Batch Lookup. After 5 minutes without activity it also returns there.
Batch Lookup is available to every role. What the operator can fill in still follows their role and step assignment.
Cost Estimation (Admin)
When steps have a cost in the Process Steps library, the part page shows Cost Estimation to Admins:
- Cost / Part and Total Cost (cost per part times the required quantity)
- A per-hour step needs an ETA on the part, set in Step Details. While any is missing, the totals show N/A and Some steps missing ETA appears.
Admin and PowerUser can override a step's cost and ETA for one part in Step Details. Only Admins see the totals.
CRM: Customers, Quotes, Invoices
What is the CRM?
The CRM keeps the commercial side of your work in one place: your customer list, quotes, invoices, payments and shipments.
- Who can use it: Admin only. Other roles do not see the CRM.
- Where: on the Dashboard, open the Admin Tools menu in the header and choose CRM.
- Left menu: Customers, Invoices, Quotations (only after Quotations are turned on in Settings) and Settings.
Each list opens a details panel below the table when you click a row. Use the collapse button on the panel to close it.
Adding and Editing Customers
To add a customer:
- Open CRM > Customers
- Click Add Customer
- Enter the Name and the Alias (both required). The alias starts as the name and stops following it once you change it.
- Optionally fill in Code, Contact Person, Email, Phone, Address, Country, Website, Payment Terms, Tax ID, Currency and Notes
- Choose where the customer is offered under Show in (see Customer Visibility)
- Click Add
To edit a customer, click its row. The details panel shows Details, Contact Information and Business Details; click any value to change it.
- Filter and sort the table by any column. The status filter shows Active, Archived or All customers.
- Payment Terms and Currency are used as defaults when you invoice this customer. For example "Net 45" sets the due date 45 days after the invoice date.
Archive or delete: a customer that was never used on a report, project, quote or invoice can be deleted. Once it is used, choose Archive instead: it is hidden from the list and cannot be picked on new reports or projects, but existing links stay. Use Restore to bring it back. To archive or delete many customers at once, see Selecting Several Customers.
Customer Names and Aliases
Every customer has a real Name and an Alias.
- Only the CRM page (Admin) shows the real name. Everywhere else, customer lists on reports and projects show the alias.
- Use a different alias to hide who the customer is from your team, for example "Customer A". The table then shows a Masked badge.
- Two customers may share an alias. You get a warning so you can check it is intended.
Renaming an alias: when you change the alias in the customer panel, the Customer field is updated on every report and project linked to that customer. A message tells you how many were updated. Locked reports keep the previous name.
Invoices, quotes and packing lists are for the customer, so they print the real name.
Customer Visibility in Reports and MES
Each customer has two switches under Show in:
- Show in Reports: the customer is offered in the customer list on reports
- Show in MES: the customer is offered in the customer list on manufacturing projects
The table shows Reports only, MES only or Not in pickers when a customer is not offered everywhere. A customer that is not in any picker stays in the CRM and can be shown again later.
Selecting Several Customers
To archive, restore or delete many customers at once:
- Open CRM > Customers
- Tick the box at the start of each row you want. The box in the header selects every customer shown by the current filters.
- A bar above the table shows how many are selected, with Archive, Restore (when archived customers are selected), Delete and Clear selection
- Choose the action and confirm
Delete: customers that were never used are deleted permanently. Customers used on a report, project, quote or invoice cannot be deleted, so they are archived instead. The confirm window shows how many of each.
Tip: filter the table first (for example by Country, or set the status filter to Archived), then use the header box to select only those customers.
Importing Customers from Excel or CSV
Bring your customer list from Excel or another CRM. Nothing is saved until you click Import.
Who can import: Admin by default. Other roles can be given access in Admin > Access.
- Open CRM > Settings > CRM Import
- Upload: drop a .xlsx or .csv file. The first row must hold the column names. For an Excel file with several sheets, choose the sheet.
- Match columns: each file column is matched to a CRM field automatically. Change the match, uncheck a column to leave it out, or choose + New field to keep it as a new customer field. One column must be matched to Name. For date columns, choose whether the day or the month comes first.
- Duplicates: customers already in your CRM are listed. Choose Keep to leave one as it is, or Update to write the new values. An empty cell never erases a value. Update all and Skip all apply to every row.
- Confirm: check the counts and any rows with errors. Choose where the new customers are offered: Show in Reports and Show in MES. Click Import.
If the Alias is not matched, each alias is the same as the name.
Undo: the last import can be undone from the Last import box. Added customers are removed and updated customers get their old values back. Customers edited after the import, or already used on reports, projects, quotes or invoices, are left as they are.
CRM Fields: Your Own Customer Fields
Open CRM > Settings > CRM Fields to choose which customer fields are shown and to add your own.
- Add field: enter a name and a format: Text, Long text, Number, Date, Checkbox or List (enter the list options)
- Shown: hide a field you do not use. Name and Alias are always shown.
- Order: use the arrows to move a field up or down. Fields appear in this order in the customer panel and in the Add Customer form.
- Rename a field at any time. Its format can only be changed if every existing value fits the new format.
- Delete field: you see how many customers have a value in it first.
Click Save when done. Fields added during an import appear here too.
Picking a Customer on Reports and Projects
The Customer field on reports (Create Report and the report details panel) and on manufacturing projects (new project, edit project) is a searchable list of your CRM customers.
- Click the Customer field
- Type to filter the list, then click a customer
- To empty the field, choose Clear
Adding a new customer from the list (Admin and PowerUser): type the name and choose Add customer "name". The customer is created in the CRM and selected. An Admin can add the details later on the CRM page.
User role: type a name and choose Use "name" to keep it as plain text, without creating a customer.
If your organization has no customers yet, the field works as a normal text box.
Turning On Quotations
Quotes are off until an Admin turns them on.
- Open CRM > Settings
- Switch on Quotations
- Optionally set the Quote number prefix (for example Q-) and Quote valid days (how long a new quote is valid after its quote date)
- Click Save
After this, the Quotations tab appears in the CRM, and the new project dialog shows a Create a quote option.
Creating a Quote
A quote does not need a project. You turn it into an order later.
To create a quote:
- Open CRM > Quotations and click New quote. You can also click + New Project on the Dashboard and tick Create a quote.
- Pick the Customer
- For each part, enter the Part name, a Description, the Qty and the Price per part. Click Add part for more rows.
- Turn tax on or off and set the Rate % if needed
- Click Save as draft, or Save and mark sent when the quote goes to the customer
Tips:
- While you type a part name, matching parts from your projects are suggested. Picking one fills in the last price you quoted for it, if any.
- The currency comes from the customer, or from the default currency in Settings.
- Every row needs a part name or a description. Empty rows are ignored.
Managing Quotes
CRM > Quotations lists your quotes with Number, Customer, Project, Quote date, Valid until, Total and Status.
- Period: 1M, 3M, 6M, 1Y or Custom
- Search and filters: search by number, customer or project; filter by status and customer
- Summary tiles: Open quotes, Expiring within 7 days, Drafts not sent yet
- Statuses: Draft, Sent, Converted
Click a quote to open its panel:
- Edit (drafts only): change customer, dates, currency, tax, lines and terms: Customer RFQ reference, Lead time, Incoterms, Payment terms, Ship-to address and Notes
- Mark sent: gives the quote its number and locks it
- Copy: starts a new draft with the same lines and terms. Use it to make a new revision of a sent quote.
- Convert to order: see Converting a Quote to an Order
- Print and Export PDF
- Delete (not for converted quotes). A deleted sent quote leaves a gap in the numbering.
- Documents: attach files such as the customer's RFQ or drawings
Converting a Quote to an Order
When the customer accepts a quote:
- Open the quote in CRM > Quotations
- Click Convert to order
- Fill in the project fields (the same fields as a new project). The customer is taken from the quote.
- Click Create order
What happens:
- A manufacturing project is created with one part per quote line, and opens.
- A draft quote is marked sent first, so it gets a number.
- The quote becomes Converted and read-only.
Needs details: parts made from a quote line show a Needs details badge on the project page. Click the part to open its edit form, add the part number, drawing and material, and save. The badge then goes away.
If a quote line was picked from an existing part, that part's details are copied to the new part.
Creating an Invoice
Invoices are created from a manufacturing project.
- Open the project
- In the left panel, click Create invoice
- Check the Customer, Invoice date, Due date and Currency
- Fill in the trade fields if you need them: Customer PO number, Incoterms, Payment terms and Ship-to address (leave it empty to use the customer address)
- Check the lines: description, part number, revision, quantity and price per piece. Use Add line or remove lines as needed.
- Click Save as draft, or Save and mark sent
Prefilled values:
- Lines come from the project's parts. Each line shows the project quantity and how much is already invoiced.
- If the project came from a quote, lines, prices and terms are copied from that quote.
- The due date follows the customer's payment terms, or the Default due days in Settings.
An invoice gets its number when it is marked sent. Drafts show Draft instead of a number. A project's invoices are listed in its left panel; click one to open it in the CRM.
The Invoices List
CRM > Invoices shows Number, Customer, Project, Date, Due, Total, Paid, Balance and Status.
- Period: 1M, 3M, 6M, 1Y or Custom
- Search and filters: search by number, customer or project; filter by status and customer
- Summary tiles: Open balance, Overdue, Paid
Statuses:
- Draft: not sent yet, can still be edited
- Sent: sent to the customer, waiting for payment
- Partially paid and Paid: follow the payments you record
- Overdue: shown when the due date has passed and a balance is left
- Cancelled
A Shipped or Partially shipped badge shows how much of the invoice has been shipped.
Payments and Invoice Status
Click an invoice to open its panel.
Draft invoices: Edit changes lines and prices; Mark sent gives the invoice its number. Only drafts can be edited.
Recording a payment (sent or partially paid invoices):
- Click Record payment
- Enter the Amount (not more than the balance), Date, and optionally Method, Reference and Note
- Click Save payment
Payments are listed in the panel. Deleting a payment raises the balance again.
Other actions:
- Cancel invoice: for drafts and unpaid open invoices. Delete the payments first if there are any. Restore brings a cancelled invoice back.
- You can change the Due date and Notes of an invoice in the panel and click Save changes.
- Delete: removes the invoice with its payments and files. A deleted sent invoice leaves a gap in the numbering. This cannot be undone.
Shipments and Packing Lists
You can ship an invoice in one go or in parts. Shipping is available once the invoice is sent.
- Open the invoice in CRM > Invoices
- In Shipments, click Generate shipment
- Each line starts at the quantity still to ship. Lower it for a partial shipment, and add a Lot number if needed.
- Enter the Ship date and optionally Carrier, Tracking number, Packages and Gross weight
- Click Create shipment
The shipment gets its own number and a packing list PDF is saved to the invoice documents. The packing list shows ordered, shipped now and remaining quantities, and a Received by / Date / Signature box.
- Use the print button on a shipment to print it, or Regenerate PDF if the PDF was not saved.
- Deleting a shipment removes it and its PDF, and its quantities can be shipped again.
PDFs, Documents and Terms
- Print and Export PDF on a quote or invoice create a document with your company details, Bill to and Ship to, trade terms, lines and totals.
- Drafts print with a DRAFT mark.
- Once a quote or invoice is sent, its PDF keeps the customer and company details as they were when it was sent.
- Documents: attach files to a quote or an invoice (for example the customer PO). Click a file to open it.
Terms and conditions: in CRM > Settings you can write separate terms for quotes, invoices and packing lists. They print on their own page at the end of the document. Leave a box empty for no terms page.
CRM Settings
Open CRM > Settings (Admin only). Click Save when done.
Invoices
- Invoice number prefix and Number padding (4 means INV-0001)
- Next invoice number: can only be raised, not lowered
- Default currency
- Enable tax, with a Tax label (for example VAT) and Tax rate (%)
- Default due days: used when the customer has no payment terms
- Footer text: printed on quotes and invoices
Quotes and shipments
- Quotations on or off, Quote number prefix, Quote valid days
- Shipment number prefix
Printed text
- Quote, invoice and shipment terms and conditions
- Bank details: printed on invoices
Inventory Control
What is Inventory Control?
Inventory Control tracks the raw material your shop buys, holds and consumes, and links it to the parts you make.
It covers four things:
- Material Catalog - every item you stock, its size, where it lives and how much is left
- Suppliers - who you buy from
- Orders - purchase orders from draft through to receiving
- Settings - material types and your company details for printed POs
The central idea: when you take material for a part, it comes off your stock immediately. What the part does not hand back is what it used. There is no separate "consume" step to remember.
Who can use it
Inventory Control is available to the Admin and PowerUser roles.
Users with the User role do not see it and cannot take or return material. Opening the page address directly sends them back to the Dashboard.
To open it, click Admin Tools in the Dashboard header, then Inventory Control. Inside, the left sidebar switches between Materials, Suppliers, Orders and Settings.
Adding a material to the catalog
Click Add Material on the Material Catalog page.
- Code (required) - your own reference, unique in your organization, e.g.
SS-304 - Name (required) - a readable description, e.g. "Stainless Steel 304"
- Stock Format (required) - how the material is physically held and counted (see below)
- Material Type (required) - the family it belongs to, e.g. SS or Aluminum. Pick from the list, or add a new one with the + button
- Unit of Measure - the unit the dimensions are in: mm, m, in or ft
- Location - where it is stored, e.g. "Shelf A3". This is a label, not an enforced warehouse system
- Description - optional notes
Stock formats and their dimensions:
- Pieces - counted units. Size is optional: Length, Width, Height, Diameter and a unit. Fill in only what applies
- Rod (D x L) - diameter and length, both required
- Bar (W x H x L) - width, height and length, all required
- Sheet (W x L x T) - width, length and thickness, all required
The format decides what a stock quantity means. A rod's stock is a count of rods, not millimetres - the dimensions describe how big one rod is.
A new material starts with no stock. Stock arrives when you receive a purchase order, or with Adjust Stock.
Stock Format, Material Type and the dimensions cannot be changed after the material is created.
Understanding stock numbers
The catalog shows for each material:
- Available - what you can take right now
- On Order - quantity on purchase orders that has not arrived yet. Draft orders count too; cancelled and fully received lines do not
- Last Activity - the date of the latest stock movement or purchase order. The catalog opens sorted by this, newest first
Available goes down when you take material for a part, and up when material is received from a purchase order or handed back.
A row turns red when its Available is at or below the material's low-stock alert threshold.
There is no "allocated" figure. Material taken for a part has genuinely left the shelf, so it is not counted as available. To see where it went, open the material and look at Held by parts, which names each part and how much it is holding. Click a part to open it.
Taking material for a part
Material is taken from the part, not from the catalog.
- Open a project and Add Part, or open an existing part and click Edit
- Go to the Materials Required tab
- Filter by Material Type or search by code or name
- Type a quantity into the Take column for each item you want
- Save
You can take from several materials at once - fill in the Take column on as many rows as you need. The footer at the bottom of the dialog shows what will be taken, on every tab, so you can check it without switching back.
On an existing part, the tab also shows Currently held - how much was issued, how much came back, and what the part still holds.
If you ask for more than is available the save is refused and nothing is taken. Either the whole basket succeeds or none of it does.
Pieces and the part's Stock Qty: pcs taken from a Pieces material are added to the part's Stock Qty. This works one way only: returning material does not lower Stock Qty, and you can still edit Stock Qty by hand.
When you save, a warning can appear:
- Stock is below the required quantity - Stock Qty is less than Required Qty
- No extra stock - Stock Qty equals Required Qty, so there is no buffer for rejects
Click Save anyway to continue, or Go back to change it. The save is not blocked.
Offcuts (Remains)
When you cut a 3000 mm rod down and have 1800 mm left over, that leftover becomes its own row in the catalog.
- It is coded after its parent: an offcut of
ss-304 becomes **ss-304_1**, then ss-304_2, and so on - It inherits the parent's name, material type, format and location - only the size differs
- It is marked with a REMAIN badge so you can tell it from full-size stock
- It can be taken for another part exactly like any other material
Offcuts look after themselves:
- Take an offcut and it disappears from the catalog - it is on the job now
- Hand it back untouched and it comes back
- Cut it down further and you get a new offcut, numbered from the original parent - so an offcut of
ss-304_1 is ss-304_3, not ss-304_1_1
Numbers are never reused. Each one refers to one specific physical piece, permanently.
Returning material to inventory
Open the part and click Return to Inventory in the Material Information panel.
For each item the part is holding you decide:
- Whole pieces back to stock - complete, uncut pieces going back on the shelf
- Add offcut - a cut-down piece. Enter its new size; the dialog shows the code it creates before you commit
Only the dimension a cut can actually change is editable. A rod or bar gets shorter but keeps its other sizes. A sheet loses width and length but keeps its thickness. Pieces cannot be cut at all. An offcut must be smaller than the piece it was cut from.
Anything you do not hand back simply stays with the part - the dialog shows how much stays. It is not written off and not marked used. You can hold material for weeks and return it in stages. Whatever the part still holds when the job ends is what it consumed - you never have to declare that.
Finding things in the catalog
Under the column headers is a filter row:
- Type in Code, Name or Location to narrow the list
- Pick from Material Type and Stock Format
- Turn on Show archived to include materials you archived
Click a column header to sort by it; click again to reverse.
Offcuts on the rack are listed with a REMAIN badge next to their code. An offcut that has been used up is not listed at all, not even with Show archived on - it is on a job. To find it, open the material it was cut from and look at Held by parts, or open the part.
If nothing matches, click Clear filters.
Suppliers
Open Suppliers in the left sidebar. Click Add Supplier to add one. Only Name is required; you can also store a code, contact, email, phone, address, country, website, payment terms, tax ID, currency and notes.
Click a row to open it in the panel below the table. On the Detail tab, click any field to edit it in place. The Orders tab lists its purchase orders, and New Order starts an order for this supplier.
A supplier that has never been ordered from can be deleted. One that appears on any purchase order, even a cancelled one, can only be archived. Archiving hides it from the supplier list and keeps its orders intact; Restore brings it back.
The Status filter in the table shows Active suppliers by default. Switch it to Archived or All to see archived ones.
Creating a purchase order
On the Orders page click New Order. You can also click New Order inside a material or supplier panel, which fills that material or supplier in for you.
- Pick the Supplier
- The PO Number is generated for you. You can change it, but it must be unique
- Set an Expected Date and any Notes
- Click Add Line for each item - each line needs a material, a quantity and a unit cost
- Optionally upload the supplier quote and attach other documents
- Click Save as Draft, or Issue PO straight away
While an order is a Draft or Issued and nothing has been received, you can change its lines: open it and click Edit Lines. A save bar appears when something changed. Expected Date and Notes can be changed until the order is cancelled.
Issuing sets the order date and saves a PDF of the order to its documents. On a draft, Preview PDF shows the order with (DRAFT) in the title so it cannot be mistaken for a real order.
Orders whose Expected Date has passed and that are not yet received are shown in red in the table.
To stop an order, click Cancel Order. Quantities already received stay in stock.
Receiving an order
Open the order and click Receive Purchase Order on a line.
Enter the Quantity to Receive - it does not have to be the full amount, but it cannot be more than what is still remaining. Click Confirm Receipt. Stock for that material goes up immediately, and the line records what is still outstanding.
The order status follows along by itself:
- Issued - nothing received yet
- Partially Received - some lines or some quantities have arrived
- Received - everything has arrived
You can only receive against an Issued or Partially Received order. A draft must be issued first.
Once anything has been received the order's lines can no longer be edited, and the supplier quote can no longer be replaced. This is deliberate: the order has to keep matching what was actually delivered.
Documents on an order
An order's Documents list can hold:
- Supplier Quote - upload it when creating the order, or later with Attach Quote (PDF, Word, JPG or PNG). Replace Quote works until something is received
- Issued PO - the PDF saved when you issued the order
- PO versions - every PDF made with Generate New PO Version
- Other documents - delivery notes, certificates, correspondence. Attach as many as you like with Attach Document
Supporting documents can be attached at any stage, including after the order is fully received or cancelled - which is usually exactly when the delivery note or certificate turns up.
Click any document to open it. To remove an attached document, click its bin icon and confirm. The file is deleted permanently.
The Orders table also has Quote and PO columns, so you can open those files without opening the order.
Minimum stock alerts
There are two different low-stock alerts. They are easy to confuse, so be clear which one you want.
Material stock alert - set in the Minimum Stock Alert box on a material's Detail tab in Inventory Control. Turn it on, enter a Threshold and choose Recipients. It warns when the *available raw stock* of that material is at or below the threshold, so you know to re-order. Quantity only. Changes save as you make them.
Part stock alert - set on the Minimum Stock Alert tab of the Add or Edit Part dialog. Warns when the *finished stock* of that part falls below a buffer against its required quantity. Supports Quantity or Percent, and shows the resulting piece count as you type.
Both send an alert sticker note to the users and groups you choose. A material alert is sent once when stock drops to the threshold, and again only after stock has gone back above it and dropped again.
The movements log
Every change to stock is recorded. Open a material and go to the Movements tab to see its history, 20 rows per page. Each row shows the date, type, the part and project it went to or came from, the quantity and any notes.
- Receive - arrived from a purchase order
- Issue - taken for a part
- Return - handed back from a part, or a new offcut created
- Adjust In / Adjust Out - a manual correction, which always requires a reason
The log is permanent. Entries cannot be edited or deleted by anyone, which is what makes it usable as an audit trail. If something is wrong, correct it with an adjustment - the mistake and the correction both stay visible.
To correct stock, click Adjust Stock in the material panel, choose Add Stock or Remove Stock, enter the Quantity and a Reason. The dialog shows the stock after the change. You cannot remove more than is available.
Use Adjust Stock for genuine physical corrections - scrap, a miscount, a write-off. Do not use it to hand material back from a part; use Return to Inventory, so the ledger keeps the two apart.
Common questions
"This part still holds material" when deleting a part
The part has not returned everything it took. Deleting it would remove that stock from the catalog with no record of where it went. Use Return material in the message to go to the part, hand the material back, then delete it.
A material cannot be deleted
A material that has ever been used - in a movement, on a purchase order, by a part, or as the parent of an offcut - cannot be deleted, because doing so would break that history. Archive it instead: it disappears from the catalog and cannot be taken for parts, and the history stays intact.
"Insufficient stock" when taking material
Another part may have taken it, or it was never received. Check Available on the material, and On Order to see if a delivery is outstanding.
An offcut vanished from the catalog
It was taken for a part. Used-up offcuts are not listed, even with Show archived on. Open the material it was cut from and look at Held by parts.
Stock looks wrong
Open the material's Movements tab. Every change is listed with its date, type, part and project, quantity and notes.
I archived a material by mistake
Turn on Show archived, open the material and click Restore.
Viewing and editing a material
Click a material in the catalog. Its panel opens below the table.
The top bar shows the code, name, status, Stock and On Order, plus the buttons Archive, Delete and Adjust Stock.
The panel has three tabs:
- Detail - the material's attributes, Held by parts and the Minimum Stock Alert
- Orders - purchase orders that include this material, with New Order to order more
- Movements - every stock change for this material
On the Detail tab, click Name, Location or Description to edit it in place. The change saves by itself.
Material Type, Stock Format and dimensions cannot be changed. They describe the physical stock, and changing them would change what every past movement and order referred to. If they are wrong, archive the material and add a new one.
Archive, restore or delete a material
Open the material and use the buttons in the panel's top bar.
- Delete - removes the material permanently. Only possible while it has never been used: no movement, no purchase order line and no part has ever referred to it. Otherwise the button is greyed out
- Archive - hides the material from the catalog. It cannot be taken for parts or picked on new orders, and its history is kept
- Restore - shown on an archived material. Puts it back in the catalog
To see archived materials, turn on Show archived in the catalog's filter row.
If a delete is refused, a message lists what still refers to the material (movements, orders, parts) and offers Archive instead.
Offcuts have no Archive button. They leave the catalog by themselves when they are used up, and come back if returned.
PO PDF versions
Once an order has been issued, the PDF saved at that moment is kept as the record of what your supplier received. It is never overwritten.
If something changes later - your company details, the supplier's details, or the order's lines before anything is received - click Generate New PO Version in the order panel.
- A new PDF is built from the current data
- It is numbered: the first one is v2, then v3, and so on. The version number is printed next to the PO number in the PDF
- It is saved to the order's Documents and opens so you can check it or send it
On a Draft order the button is Preview PDF instead. It only shows the PDF, marked (DRAFT), and saves nothing.
Inventory settings
Open Settings in the Inventory Control sidebar.
Company Profile - the Address and Phone printed on your purchase orders. Click Save after changing them. The company name and banner image on the PO come from your organization settings.
Material Types - the list offered when you add a material. Type a name and click + to add one, or click the x on a type to remove it from the list. Removing a type does not change materials that already use it.
You can also add a material type while adding a material, with the + next to Material Type.
Working with the tables and panels
Materials, Suppliers and Orders all work the same way: a table on top, and a details panel below it.
- Click a row to open its panel. Drag the line between table and panel to resize it
- Click the collapse button at the right of the panel's top bar to close it. If the panel is hidden, Show details in the page header brings it back
- Each mode keeps its own selection, so you can switch between Materials, Suppliers and Orders without losing your place
The Orders table has a filter row too: type a PO Number, pick a Supplier or a Status, and filter the Date, Expected and Received columns by Range, Before or After. Click a column header to sort.
If you edited an order and click another one without saving, you are asked whether to Discard your changes.
Hover help on fields
In Inventory Control, labels with a dotted underline have a short explanation. Hover over the label to read it - for example Available, On Order, Last Activity, Stock Format or Archive.
The explanations are one line each. For anything longer, use this Help page.